| Title |
(A) Installation Of 750 Kva, 3.3 Kv/440 V, Transformer At New Mines Colony For Using As Colony Transformer And (B) Installation Of 50 Kva, 3.3 Kv /440 V, Transformer At Sawang Main Sub Station At Swg Gvp Ph Ii Ocp.
|
| Description |
(A) Installation Of 750 Kva, 3.3 Kv/440 V, Transformer At New Mines Colony For Using As Colony Transformer And (B) Installation Of 50 Kva, 3.3 Kv /440 V, Transformer At Sawang Main Sub Station At Swg Gvp Ph Ii Ocp.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_328914_1 |
|
Reference Number |
PE(E and M)/GVP Ph-II/E-Tender/2024-25/33 , Dt-12.02.2025 |
| Tender Fee | 0 |
| EMD | 6800 |
| Tender Value | |
| Place | Office of the Project Engineer (E and M), GVP Ph-I |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340923 |
| Start Date | February 14, 2025 19:30 |
| End Date |
Expired
26/02/2025
Expired 473 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Complete overhauling of transformer of 3mva, 11kv/3.3kv, make-andrew yule, sl.no. 11365 at main sub-station of gvp ph-ii ocp.
Complete overhauling of transformer of 3mva, 11kv/3.3kv, make-andrew yule, sl.no. 11365 at main sub-station of gvp ph-ii ocp.
Read moreProviding and fixing of rubber mate in front of zero point sub-station and main sub-station at swg-gvp ph-ii ocp.
Providing and fixing of rubber mate in front of zero point sub-station and main sub-station at swg-gvp ph-ii ocp.
Read more(a) providing and fixing of l.t control panel 440v, 800a as secondary controlling of 250kva, 3.3kv/440v transformer installed at main sub-station at gvp phase-ii ocp (b) repairing and re-winding of 55kw, 440v make-wnp for washing station and water s
(a) providing and fixing of l.t control panel 440v, 800a as secondary controlling of 250kva, 3.3kv/440v transformer installed at main sub-station at gvp phase-ii ocp (b) repairing and re-winding of 55kw, 440v make-wnp for washing station and water s
Read moreDismantling of 3mva, 11kv/3.3kv and re-installation of 3mva, 11kv/3.3kv, power transformer with repairing of one no. vcb at zero point sub-station of gvp ph-ii ocp.
Dismantling of 3mva, 11kv/3.3kv and re-installation of 3mva, 11kv/3.3kv, power transformer with repairing of one no. vcb at zero point sub-station of gvp ph-ii ocp.
 
Read moreInstallation of sky net screening in 02 nos. weigh bridges and main sub-station of swg-gvp ph-ii.
Installation of sky net screening in 02 nos. weigh bridges and main sub-station of swg-gvp ph-ii.
Read moreCleaning of garland drain along the boundary lines of mines, along haul road and despatch road of gvp ph-ii ocp under sawang gvp ph-ii, kathara area
Cleaning of garland drain along the boundary lines of mines, along haul road and despatch road of gvp ph-ii ocp under sawang gvp ph-ii, kathara area
Read moreSupply and fixing of bi metallic sheet ( copper and aluminum) for all vcb, ocb and control panel of sawang main-station at gvp ph-ii ocp.
Supply and fixing of bi metallic sheet ( copper and aluminum) for all vcb, ocb and control panel of sawang main-station at gvp ph-ii ocp.
Read moreA. repairing of 3.3kv ocb switch 400a, ctr-100/5a, make-ece, sl.no.-1437 installed at main sub-station of gvp phase-ii ocp and b.repairing of 3.3kv ocb switch 400a, ctr-100/5a, make-ece, sl.no.1439 installed at main sub-station of gvp phase-ii ocp.
A. repairing of 3.3kv ocb switch 400a, ctr-100/5a, make-ece, sl.no.-1437 installed at main sub-station of gvp phase-ii ocp and b.repairing of 3.3kv ocb switch 400a, ctr-100/5a, make-ece, sl.no.1439 installed at main sub-station of gvp phase-ii ocp.
Read moreMaintenance work of ht line overhead line (11kv swg feeder, 11kv gvp ph-ii ocp feeder for monsoon preparation 2025 under gvp ph-ii ocp of kathara area
Maintenance work of ht line overhead line (11kv swg feeder, 11kv gvp ph-ii ocp feeder for monsoon preparation 2025 under gvp ph-ii ocp of kathara area
Read more(a). repairing and maintenance of capacitor bank 180 kvar, 3.3kv rating, sl.no.-ep/mv-15-030, make-epcos india pvt. ltd installed at zero point main sub-station of gvp phase-ii ocp, (b). repairing of 630kva transformer, 3.3kv/440v, sl.no.-224215/5 ge
(a). repairing and maintenance of capacitor bank 180 kvar, 3.3kv rating, sl.no.-ep/mv-15-030, make-epcos india pvt. ltd installed at zero point main sub-station of gvp phase-ii ocp, (b). repairing of 630kva transformer, 3.3kv/440v, sl.no.-224215/5 ge
Read moreof your Industry type