Tender Details
Particulars | Details |
---|---|
Title |
Expansion Of Water Supply Pipeline At Sawargaon Under 15th Finance Commission G P Level 2024 25
|
Description |
Expansion Of Water Supply Pipeline At Sawargaon Under 15th Finance Commission G P Level 2024 25
|
Organisation | RDD-CEO-AURANGABAD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 500 |
EMD | 1 |
Tender Value | |
Place | Grampanchayat Sawargaon |
Link |
AAAAAAAAAA Login to view |
Start Date | May 31, 2025 15:35 |
End Date |
05/06/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Special repair to bldg no. t-61 (supply pm) provn of repair shed with hardstanding near bldg no. p-04 and provn of drainage at nlp mil stn under ge 872 ews
Special repair to bldg no. t-61 (supply pm) provn of repair shed with hardstanding near bldg no. p-04 and provn of drainage at nlp mil stn under ge 872 ews
Read moreSupply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block
Supply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block
Read moreConstruction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Read moreImplementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b
Implementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b (neres-xxv part-b)
Read moreCa no cwe/amb/north-71 of 2024-25 construction of infrastructure for lab under pm shri kendriya vidyalaya no 01 at ambala cantt
Ca no cwe/amb/north-71 of 2024-25 construction of infrastructure for lab under pm shri kendriya vidyalaya no 01 at ambala cantt
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreRenovation of toilets of residential area at p.u. campus, sector-14 and 25, chandigarh.(type e-1,f,g including equivalent categories rs. 60.00lacs)
Renovation of toilets of residential area at p.u. campus, sector-14 and 25, chandigarh.(type e-1,f,g including equivalent categories rs. 60.00lacs)
Read moreSupply of 150 watt led flood light at various sub station under etd hamirpur.
Supply of 150 watt led flood light at various sub station under etd hamirpur.
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreof your Industry type