Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 6 Lane Underpasses (3 Nos) And Allied Works On Existing 4 Lane Hyd To Blr Sec Of Nh 44 From Km 99.700 To Km 187.300 In The State Of Tg On Epc Mode, As Part Of Long Term Rectification Of Mo Rth Identified Black Spots Tg 03 71, Tg 05 39
|
| Description |
Construction Of 6 Lane Underpasses (3 Nos) And Allied Works On Existing 4 Lane Hyd To Blr Sec Of Nh 44 From Km 99.700 To 187.300 In The State Of Tg On Epc Mode, As Part Of Long Term Rectification Of Mo Rth Identified Black Spots Tg 03 71, Tg 05 39
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_256495_1 |
|
Reference Number |
NHAI/RO-HYD/Blackspots/NH 44/Hyd-Bgl/2025/36 |
| Tender Fee | 10000 |
| EMD | 78.54 Lakh |
| Tender Value | - |
| Place | Hyd to Blr Sec of NH-44 from km 99.700 to 187.300 |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=295755 |
| Start Date | November 22, 2025 23:30 |
| End Date |
Expired
20/12/2025
Expired 262 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreConstruction of double lane steel truss girder bridge 3 x 30 m span on road nhia km 55th to surara, package no jk07-wb-01 at rd 5.575 to 5.675
Construction of double lane steel truss girder bridge 3 x 30 m span on road nhia km 55th to surara, package no jk07-wb-01 at rd 5.575 to 5.675
Read moreConstruction of 6 lane underpasses (4 nos) and allied works on existing 4 lane hyderabad-bangalore section of nh 44 from km 89 to km 124 in the state of telangana on epc mode, as part of long term rectification of morth identified black spots.
Construction of 6 lane underpasses (4 nos) and allied works on existing 4 lane hyderabad-bangalore section of nh 44 from km 89 to km 124 in the state of telangana on epc mode, as part of long term rectification of morth identified black spots.
Read moreConstruction of 6 lane underpasses (4 nos) and allied works on existing 4 lane hyderabad-bangalore section of nh-44 from km 125 to 158 in the state of telangana on epc mode, as part of long-term rectification of morth identified black spots.
Construction of 6 lane underpasses (4 nos) and allied works on existing 4 lane hyderabad-bangalore section of nh-44 from km 125 to 158 in the state of telangana on epc mode, as part of long-term rectification of morth identified black spots.
Read moreConstruction of 6-lane underpasses (5 nos) and allied works on existing 4 lane hyderabad to bangalore section of nh-44 from km 35.165 to km 74.965 in the state of telangana on epc mode, as part of long term rectification of morth identified black spo
Construction of 6-lane underpasses (5 nos) and allied works on existing 4 lane hyderabad to bangalore section of nh-44 from km 35.165 to km 74.965 in the state of telangana on epc mode, as part of long term rectification of morth identified black spo
Read moreLong-term rectification of morth identified blackspots by 1. tg 03 23 ii. tg 03 26. iii. tg 04 24. iv. tg 04 26 on nagpur to hyderabad section of nh 44 from km.412 to 439 in the state of tg on epc mode.
Long-term rectification of morth identified blackspots by 1. tg 03 23 ii. tg 03 26. iii. tg 04 24. iv. tg 04 26 on nagpur to hyderabad section of nh 44 from km.412 to 439 in the state of tg on epc mode.
Read moreConstruction of 6 lane underpasses (2 no) and allied works on existing 4 lane hyderabad to bangalore sec.of nh44 at kanimetta(km 125.890 to 127.250) n thomalapally(km 149.110 to 150.760) in the state of tg on epc mode (tg 02 26 n tg 02 418).
Construction of 6 lane underpasses (2 no) and allied works on existing 4 lane hyderabad to bangalore sec.of nh44 at kanimetta(km 125.890 to 127.250) n thomalapally(km 149.110 to 150.760) in the state of tg on epc mode (tg 02 26 n tg 02 418).
Read moreConstruction of 6 lane flyover(1x25.1x30.1x25) at km.21.076 (ghatkesar junction of morth identified blackspot tg 03 187) and lvup (12mx4m) at km.21.890 (ghattumaisamma junction) on hyderabad to yadgiri section of nh 163 in the state of ts on epc mode
Construction of 6 lane flyover(1x25.1x30.1x25) at km.21.076 (ghatkesar junction of morth identified blackspot tg 03 187) and lvup (12mx4m) at km.21.890 (ghattumaisamma junction) on hyderabad to yadgiri section of nh 163 in the state of ts on epc mode
Read moreRectification of 04nos. morth identified blackspots on bharatpur mahua
Rectification of 04nos. morth identified blackspots on bharatpur mahua
 section of nh 21 in the state of rajasthan on engineering, procurement and construction (epc) mode
Read moreof your Industry type