Tender Details

Particulars Details
Title
Construction Of 6 Lane Underpasses (3 Nos) And Allied Works On Existing 4 Lane Hyd To Blr Sec Of Nh 44 From Km 99.700 To Km 187.300 In The State Of Tg On Epc Mode, As Part Of Long Term Rectification Of Mo Rth Identified Black Spots Tg 03 71, Tg 05 39
Description
Construction Of 6 Lane Underpasses (3 Nos) And Allied Works On Existing 4 Lane Hyd To Blr Sec Of Nh 44 From Km 99.700 To 187.300 In The State Of Tg On Epc Mode, As Part Of Long Term Rectification Of Mo Rth Identified Black Spots Tg 03 71, Tg 05 39
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2025_NHAI_256495_1
Reference
Number
NHAI/RO-HYD/Blackspots/NH 44/Hyd-Bgl/2025/36
Tender Fee 10000
EMD 78.54 Lakh
Tender Value -
Place Hyd to Blr Sec of NH-44 from km 99.700 to 187.300
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=295755

Start Date November 22, 2025 23:30
End Date
Expired 20/12/2025

Expired 262 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode

Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode

Read more
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Read more
Construction of double lane steel truss girder bridge 3 x 30 m span on road nhia km 55th to surara, package no jk07-wb-01 at rd 5.575 to 5.675

Construction of double lane steel truss girder bridge 3 x 30 m span on road nhia km 55th to surara, package no jk07-wb-01 at rd 5.575 to 5.675

Read more
Construction of 6 lane underpasses (4 nos) and allied works on existing 4 lane hyderabad-bangalore section of nh 44 from km 89 to km 124 in the state of telangana on epc mode, as part of long term rectification of morth identified black spots.

Construction of 6 lane underpasses (4 nos) and allied works on existing 4 lane hyderabad-bangalore section of nh 44 from km 89 to km 124 in the state of telangana on epc mode, as part of long term rectification of morth identified black spots.

Read more
Construction of 6 lane underpasses (4 nos) and allied works on existing 4 lane hyderabad-bangalore section of nh-44 from km 125 to 158 in the state of telangana on epc mode, as part of long-term rectification of morth identified black spots.

Construction of 6 lane underpasses (4 nos) and allied works on existing 4 lane hyderabad-bangalore section of nh-44 from km 125 to 158 in the state of telangana on epc mode, as part of long-term rectification of morth identified black spots.

Read more
Construction of 6-lane underpasses (5 nos) and allied works on existing 4 lane hyderabad to bangalore section of nh-44 from km 35.165 to km 74.965 in the state of telangana on epc mode, as part of long term rectification of morth identified black spo

Construction of 6-lane underpasses (5 nos) and allied works on existing 4 lane hyderabad to bangalore section of nh-44 from km 35.165 to km 74.965 in the state of telangana on epc mode, as part of long term rectification of morth identified black spo

Read more
Long-term rectification of morth identified blackspots by 1. tg 03 23 ii. tg 03 26. iii. tg 04 24. iv. tg 04 26 on nagpur to hyderabad section of nh 44 from km.412 to 439 in the state of tg on epc mode.

Long-term rectification of morth identified blackspots by 1. tg 03 23 ii. tg 03 26. iii. tg 04 24. iv. tg 04 26 on nagpur to hyderabad section of nh 44 from km.412 to 439 in the state of tg on epc mode.

Read more
Construction of 6 lane underpasses (2 no) and allied works on existing 4 lane hyderabad to bangalore sec.of nh44 at kanimetta(km 125.890 to 127.250) n thomalapally(km 149.110 to 150.760) in the state of tg on epc mode (tg 02 26 n tg 02 418).

Construction of 6 lane underpasses (2 no) and allied works on existing 4 lane hyderabad to bangalore sec.of nh44 at kanimetta(km 125.890 to 127.250) n thomalapally(km 149.110 to 150.760) in the state of tg on epc mode (tg 02 26 n tg 02 418).

Read more
Construction of 6 lane flyover(1x25.1x30.1x25) at km.21.076 (ghatkesar junction of morth identified blackspot tg 03 187) and lvup (12mx4m) at km.21.890 (ghattumaisamma junction) on hyderabad to yadgiri section of nh 163 in the state of ts on epc mode

Construction of 6 lane flyover(1x25.1x30.1x25) at km.21.076 (ghatkesar junction of morth identified blackspot tg 03 187) and lvup (12mx4m) at km.21.890 (ghattumaisamma junction) on hyderabad to yadgiri section of nh 163 in the state of ts on epc mode

Read more
Rectification of 04nos. morth identified blackspots on bharatpur mahua

Rectification of 04nos. morth identified blackspots on bharatpur mahua&#x0d section of nh 21 in the state of rajasthan on engineering, procurement and construction (epc) mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise