Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Tm Unit I Removal And Reinsulation Of Hp Ip Control Valve Area Spindle Leak Off Lines Gland Steam Pipes Of Lp Front Rear In Main Turbine During Annual Maintenance Work 2025 26
|
Description |
Mtps I Tm Unit I Removal And Reinsulation Of Hp Ip Control Valve Area Spindle Leak Off Lines Gland Steam Pipes Of Lp Front Rear In Main Turbine During Annual Maintenance Work 2025 26
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 1300 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link |
AAAAAAAAAA Login to view |
Start Date | May 08, 2025 23:30 |
End Date |
22/05/2025 ( 11 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i tm i unit i annual maintenance work in main turbine and its auxiliaries during 2025 26
Mtps i tm i unit i annual maintenance work in main turbine and its auxiliaries during 2025 26
Read moreMtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Read moreMtpsi tm unit i renewal of piston seal piston rod packing in hp lp bypass valves and its spray valves actuators including servicing of oil filters during aoh of 2025 26
Mtpsi tm unit i renewal of piston seal piston rod packing in hp lp bypass valves and its spray valves actuators including servicing of oil filters during aoh of 2025 26
Read moreMtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26
Mtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26
Read moreMtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Read moreMtps i tm unit i complete overhauling of hp bypass lp bypass spray valves oil supply unit during aoh 2025 2026
Mtps i tm unit i complete overhauling of hp bypass lp bypass spray valves oil supply unit during aoh 2025 2026
Read moreKtps-v-tm-online arresting of various gland leaks, steam/feed water leaks from various valve flanges and welding joints in pipe lines while unit is in-service pertaining to unit-9 and 10 turbine maintenance of ktps-v stage (2x250mw) during the fy 2025-2026-reg
Ktps-v-tm-online arresting of various gland leaks, steam/feed water leaks from various valve flanges and welding joints in pipe lines while unit is in-service pertaining to unit-9 and 10 turbine maintenance of ktps-v stage (2x250mw) during the fy 2025-2026
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreTtps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Ttps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Read moreTtps mech ii tm i unit i ii iii breakdown works in main turbine system such as ejectors control valves critical pipe lines etc for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm i unit i ii iii breakdown works in main turbine system such as ejectors control valves critical pipe lines etc for the period from 01 04 2025 to 31 03 2026
Read moreof your Industry type