Tender Details
Particulars | Details |
---|---|
Title |
Lrrp 2024 25 Vadakkayil Mukku Ayyanghat Road In Meppayur Gp
|
Description |
Road Concrete
|
Organisation | Local Self Government Department | State Govt. and UT |
Tender Id | 2025_LSGD_731416_1 |
Reference Number |
AE/LSGD/MPR/LRRP/1/2024-25 |
Tender Fee | 2760 |
EMD | 31771 |
Tender Value | |
Place | MEPPAYUR |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1199785 |
Start Date | February 28, 2025 23:30 |
End Date |
07/03/2025 ( Expired 18 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for preparation of dpr of farakka raiganj section of nh-12 (old nh-34) for long term mitigation measures of black spots ids wb-04-52-bs and wb-03-73-bs and construction of service road at sujapur area in the state of west bengal
Consultancy services for preparation of dpr of farakka raiganj section of nh-12 (old nh-34) for long term mitigation measures of black spots ids wb-04-52-bs and wb-03-73-bs and construction of service road at sujapur area in the state of west bengal
Read moreConstruction of vehicular underpass (vup) including approaches near peddem junction at km 502.327 of nh-66 in the state of goa on epc mode under annual plan 2024-25.
Construction of vehicular underpass (vup) including approaches near peddem junction at km 502.327 of nh-66 in the state of goa on epc mode under annual plan 2024-25.
Read moreConsultancy services for preparation of detailed project report for widening and strengthening from km 327.700 to km 413.700 and km 429.700 to km 513.700 on nh-326 in the state of odisha under annual plan 2024-25
Consultancy services for preparation of detailed project report for widening and strengthening from km 327.700 to km 413.700 and km 429.700 to km 513.700 on nh-326 in the state of odisha under annual plan 2024-25
Read moreConstruction of six lane greenfield patna ring road highway (nh131g) from kanhauli to sherpur (from km. 0.000 to km 8.480) including junction development with bihta danapur elevated corridor (length1.5 km) (tl 9.98 km.) in bihar.
Construction of six lane greenfield patna ring road highway (nh131g) from kanhauli to sherpur (from km. 0.000 to km 8.480) including junction development with bihta danapur elevated corridor (length1.5 km) (tl 9.98 km.) in bihar.
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)
Read moreUpgradation of road budhal mahoregul from existing chainage km 65.880 to km 86.725 (design chainage km 53.250 to km 88.200 net length 34.950 km package iii to nhdl specification under p sampark in ut of j k on epc mode
Upgradation of road budhal mahoregul from existing chainage km 65.880 to km 86.725 (design chainage km 53.250 to km 88.200 net length 34.950 km package iii to nhdl specification under p sampark in ut of j k on epc mode
Read moreWidening of existing 2l, ps road to 4 lane with paved shoulder from km 69/750 to km 75/750 kushthla sawai madhopur section of nh 552 extn on epc mode under annual plan 2024-25 in the state of rajasthan. job no. nh552extn. rj / 2024-25/861
Widening of existing 2l, ps road to 4 lane with paved shoulder from km 69/750 to km 75/750 kushthla sawai madhopur section of nh 552 extn on epc mode under annual plan 2024-25 in the state of rajasthan. job no. nh552extn. rj / 2024-25/861
Read moreStrengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore - villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu
Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreConstruction of minor bridge at hangarga khurd village at km 84.820 on nh161a kundral to wazar road section including its approach road on epc mode in the state of maharashtra total length including approach 0.361 km
Construction of minor bridge at hangarga khurd village at km 84.820 on nh161a kundral to wazar road section including its approach road on epc mode in the state of maharashtra total length including approach 0.361 km
Read moreof your Industry type