Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ie Services During O And M Period For 8 Lane Vadodara Kim Expressway From Km 190.000 To Km 217.500 (Package Vii Gandeva To Ena Section) And From Km 217.500 To Km 254.430 (Package Vi Ena To Kim Section) In The State Of Gujarat On Ham
|
| Description |
Ie Services During O And M Period For 8 Lane Vadodara Kim Expressway From Km 190.000 To Km 217.500 (Package Vii Gandeva To Ena Section) And From Km 217.500 To Km 254.430 (Package Vi Ena To Kim Section) In The State Of Gujarat On Ham
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_244078_1 |
|
Reference Number |
NHAI/ROGNR/NE-4/ VME-6,7/IE/OM/2025 |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | |
| Place | NHAI, Regional Office, Gandhinagar |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=278832 |
| Start Date | August 06, 2025 00:00 |
| End Date |
Expired
08/09/2025
Expired 298 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ie services during onm period of tolling operation maintenance n transfer of 1.raipur to sa sec of nh30 old nh200 from km0.000 to km48.580 2.sa to bilaspur sec of nh130 old nh200 n nh49 from km.48.580 to km.126.525 in chhattisgarh
Ie services during onm period of tolling operation maintenance n transfer of 1.raipur to sa sec of nh30 old nh200 from km0.000 to km48.580 2.sa to bilaspur sec of nh130 old nh200 n nh49 from km.48.580 to km.126.525 in chhattisgarh
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreIndependent engineer services during o and m period for 8 lane vadodara kim expressway from km 279.00 to km 292.00 (package iv - ankleshwar to manubar) and from km 254.430 to km 279.00 (package v - kim to ankleshwar) in the state of gujarat on ham
Independent engineer services during o and m period for 8 lane vadodara kim expressway from km 279.00 to km 292.00 (package iv - ankleshwar to manubar) and from km 254.430 to km 279.00 (package v - kim to ankleshwar) in the state of gujarat on ham
Read moreOperation and maintenance of eight lane vadodara kim expressway from km 323.00 to km 355.00 (sanpa to padra section of vadodara mumbai expressway) in the state of gujarat
Operation and maintenance of eight lane vadodara kim expressway from km 323.00 to km 355.00 (sanpa to padra section of vadodara mumbai expressway) in the state of gujarat
Read moreIe services for construction of 8l vadodara-kim expressway from km 279.00 to km 292.00 (pkg iv-ankleshwar to manubar) and from km 254.430 to km 279.00 (pkg v-kim to ankleshwar) in the state of gujarat under bharatmala pariyojana on ham
Ie services for construction of 8l vadodara-kim expressway from km 279.00 to km 292.00 (pkg iv-ankleshwar to manubar) and from km 254.430 to km 279.00 (pkg v-kim to ankleshwar) in the state of gujarat under bharatmala pariyojana on ham
Read moreIe services during o-m period of 4l of dwarka (kuranga-khambhaliya-devariya section from new ch km 0.000(kurunga) to km 76.270(vadinar junction) (design length 76.270 km) on nh 151-a in the state of gujarat on ham.
Ie services during o-m period of 4l of dwarka (kuranga-khambhaliya-devariya section from new ch km 0.000(kurunga) to km 76.270(vadinar junction) (design length 76.270 km) on nh 151-a in the state of gujarat on ham.
Read moreIe services for const. of 8l vadodara kim exp. from km 279.00 to km 292.00 (pkg iv -ankleshwar to manubar section) and from km 254.430 to km 279.00 (pkg v- kim to ankleshwar section) in the state of gujarat under bharatmala pariyojana on ham.
Ie services for const. of 8l vadodara kim exp. from km 279.00 to km 292.00 (pkg iv -ankleshwar to manubar section) and from km 254.430 to km 279.00 (pkg v- kim to ankleshwar section) in the state of gujarat under bharatmala pariyojana on ham.
Read moreIe services during o and m period for 6 laned ahmedabad-vadodara section of nh-48 from km 6.4 to km 108.7 (length-102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.0 to km 93.3 (length 93.3 km) in gujarat under nhdp-v on dbfot toll- 2nd call
Ie services during o and m period for 6 laned ahmedabad-vadodara section of nh-48 from km 6.4 to km 108.7 (length-102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.0 to km 93.3 (length 93.3 km) in gujarat under nhdp-v on dbfot toll- 2nd call
Read moreConsultancy services as ie during o and m period for the project 4 lane of lucknow sultanpur section of nh-731 from km 90.370 to km 217.795 in the state of uttar pradesh nhdp phase-iv on ham
Consultancy services as ie during o and m period for the project 4 lane of lucknow sultanpur section of nh-731 from km 90.370 to km 217.795 in the state of uttar pradesh nhdp phase-iv on ham
Read moreof your Industry type