Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ie For Construction Of 6 Lane Access Controlled Expressway From Km 0.000 To Km 43.500 (Tharad To Khimana Of Tharad Ahmedabad Expressway Design Length 43.5 Km) Under Bmp In The State Of Gujarat (Package I) On Ham
|
| Description |
Ie For Construction Of 6 Lane Access Controlled Expressway From Km 0.000 To Km 43.500 (Tharad To Khimana Of Tharad Ahmedabad Expressway Design Length 43.5 Km) Under Bmp In The State Of Gujarat (Package I) On Ham
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2022_NHAI_133114_1 |
|
Reference Number |
NHAI/Gujarat/ Tharad to Khimana /IE/Pkg-I/2022 |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | 0 |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | October 21, 2022 23:30 |
| End Date |
Expired
08/11/2023
Expired 959 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreConstruction of 6 lane access controlled expressway from km 0.000 to km 43.500 (tharad to khimana of tharad ahmedabad expressway- design length 43.5 km) under bmp in the state of gujarat (package i) on ham
Construction of 6 lane access controlled expressway from km 0.000 to km 43.500 (tharad to khimana of tharad ahmedabad expressway- design length 43.5 km) under bmp in the state of gujarat (package i) on ham
Read moreIe for construction of six lane access controlled expressway from km 43.500 to km 83.500 (khimana to diodarda of tharad ahmedabad expressway- design length 40 kms) under bmp in gujarat (pkgii) on ham.
Ie for construction of six lane access controlled expressway from km 43.500 to km 83.500 (khimana to diodarda of tharad ahmedabad expressway- design length 40 kms) under bmp in gujarat (pkgii) on ham.
Read moreIe services for construction of 6lane access controlled expressway from km 83.500 to km 127.000 (diodarda to udalpur of tharad ahmedabad expressway-design length 43.5 kms) under bharatmala pariyojana in gujarat (package iii) on ham
Ie services for construction of 6lane access controlled expressway from km 83.500 to km 127.000 (diodarda to udalpur of tharad ahmedabad expressway-design length 43.5 kms) under bharatmala pariyojana in gujarat (package iii) on ham
Read moreConstruction of six lane access controlled expressway from km 43.500 to km 83.500(khimana to diodarda of tharad ahmedabad expressway design length 40 kms) under bharatmala pariyojana in the state of gujarat (package ii) on hybrid annuity mode.
Construction of six lane access controlled expressway from km 43.500 to km 83.500(khimana to diodarda of tharad ahmedabad expressway design length 40 kms) under bharatmala pariyojana in the state of gujarat (package ii) on hybrid annuity mode.
Read moreConstruction of six lane access controlled expressway from km 83.500 to km 127.000(diodarda to udalpur of tharad ahmedabad expressway design length 43.5 kms) under bharatmala pariyojana in the gujarat(package iii) on hybrid annuity mode
Construction of six lane access controlled expressway from km 83.500 to km 127.000(diodarda to udalpur of tharad ahmedabad expressway design length 43.5 kms) under bharatmala pariyojana in the gujarat(package iii) on hybrid annuity mode
Read morePre bid engineering services for the works of 6 lane access controlled tharad ahmedabad expressway package 01 to 05 in the state of gujarat on ham mode
Pre bid engineering services for the works of 6 lane access controlled tharad ahmedabad expressway package 01 to 05 in the state of gujarat on ham mode
Read moreIndependent engineer services for construction of six lane access controlled expressway from km 127.000 to km 173.500 (udalpur to giyod of tharad ahmedabad expressway-design length 46.5 kms) under bharatmala pariyojana in gujarat (package iv) on ham
Independent engineer services for construction of six lane access controlled expressway from km 127.000 to km 173.500 (udalpur to giyod of tharad ahmedabad expressway-design length 46.5 kms) under bharatmala pariyojana in gujarat (package iv) on ham
Read moreof your Industry type