Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
P/Fixing Street Light On Firni In Village Sankroad P/Fixing Of Street Light On Firni In Village Bhageshawri P/Fixing Of Street Light On Firni In Village Jhinjhar
|
| Description |
P/Fixing Street Light On Firni In Village Sankroad P/Fixing Of Street Light On Firni In Village Bhageshawri P/Fixing Of Street Light On Firni In Village Jhinjhar
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2024_HRY_377028_1 |
|
Reference Number |
202490FF4389 0D43 43F6 A081 3932C00392C82032DEV |
| Tender Fee | 2180 |
| EMD | 1.11 Lakh |
| Tender Value | |
| Place | SANKROR BHAGESHWARI JHINJJAR |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=452993 |
| Start Date | June 12, 2024 23:30 |
| End Date |
Expired
19/06/2024
Expired 761 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreConstruction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Read moreProvision of 50 bedded crisis ward and additional alteration upgradation of building no p-7/6 operation theatre at mh in military station pithoragarh
Provision of 50 bedded crisis ward and additional alteration upgradation of building no p-7/6 operation theatre at mh in military station pithoragarh
Read moreConstruction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreRepairing of roads excavated by various services, fill up the potholes during rainy season on annual basis in mbmc area. (panel)
Repairing of roads excavated by various services, fill up the potholes during rainy season on annual basis in mbmc area. (panel)
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Read moreof your Industry type