Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Twin Tube Uni Directional Aizawal Bypass Tunnel Of Length 2.5 Km And Its Approaches Of 2.1 Km From Km 10.600 To Km 15.200 (Package 2) On Sairang Phaibawk Section Of Nh 6 In State Of Mizoram On Epc Mode
|
Description |
Construction Of Twin Tube Uni Directional Aizawal Bypass Tunnel Of Length 2.5 Km And Its Approaches Of 2.1 Km From Km 10.600 To Km 15.200 (Package 2) On Sairang Phaibawk Section Of Nh 6 In State Of Mizoram On Epc Mode
|
Organisation | IRCON International Limited | Public Sector Undertakings |
Tender Id | 2024_IRCON_206312_1 |
Reference Number |
IRCON/T 130027/Mizoram/ Aizawl Bypass Tunnel/2024 25 |
Tender Fee | 50000 |
EMD | 1.85 Crore |
Tender Value | |
Place | Aizawal, Mizoram |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=225577 |
Start Date | September 23, 2024 14:30 |
End Date |
07/10/2024 ( Expired 223 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode
Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreConsultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreIndependent engineer services for 4 laning of marakkanam-puducherry section of nh-332a in tamil nadu on ham (project length-46 km) (mahabalipuram-puducherry package-iii)
Independent engineer services for 4 laning of marakkanam-puducherry section of nh-332a in tamil nadu on ham (project length-46 km) (mahabalipuram-puducherry package-iii)
Read more4 laning of marakkanam-puducherry section of nh-332a from km 62.000-km 108.047 in tamil nadu on ham (project length-46.047 km) (mahabalipuram-puducherry package-iii)
4 laning of marakkanam-puducherry section of nh-332a from km 62.000-km 108.047 in tamil nadu on ham (project length-46.047 km) (mahabalipuram-puducherry package-iii)
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreConstruction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Read moreof your Industry type