Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Removal Of Sludge From Clarifier Unit 2 And 3 At Jai Hind Jal Prakalpa.
|
Organisation | KOLKATA MUNICIPAL CORPORATION | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 4500 |
Tender Value | |
Place | Jai Hind Jal Prakalpa |
Link |
AAAAAAAAAA Login to view |
Start Date | July 03, 2025 14:30 |
End Date |
15/07/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreRehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p
Rehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p
Read moreConstruction of road from km 17.812 to km 55.377 (package-2) of bile- migging section (km 0.00 at migging end) of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh
Construction of road from km 17.812 to km 55.377 (package-2) of bile-
 migging section (km 0.00 at migging end) of nh-913 (frontier highway) to
 intermediate lane on epc mode in the state of arunachal pradesh
Read moreConstruction of road from km 0.000 to km 17.812 (package-3) of bile- migging section (km 0.00 at migging end) of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh
Construction of road from km 0.000 to km 17.812 (package-3) of bile-
 migging section (km 0.00 at migging end) of nh-913 (frontier highway) to
 intermediate lane on epc mode in the state of arunachal pradesh
Read moreConsultancy services for preparation of detailed project report for widening work from km. 142 to 156 including construction of bridge at km. 131 and km. 148 (umarda canal bridges and ishan river bridge ) of nh-234 (old nh-91a) in the state of u.p.
Consultancy services for preparation of detailed project report for widening work from km. 142 to 156 including construction of bridge at km. 131 and km. 148 (umarda canal bridges and ishan river bridge ) of nh-234 (old nh-91a) in the state of u.p.
Read moreConsultancy services for authority engineer for supervision of widening and improvement of shangshak-tengnoupal road pkg-1 and widening and improvement of shangshak-tengnoupal road pkg-3 of nh-102a into 2 lane with hard shoulder.
Consultancy services for authority engineer for supervision of widening and improvement of shangshak-tengnoupal road pkg-1 and widening and improvement of shangshak-tengnoupal road pkg-3 of nh-102a into 2 lane with hard shoulder.
Read moreCutting, uprooting and removal of trees for the work of widening to 2l ps in km 15/600-38/800 (except km 28/2-28/6 and km 33/100-33/200) and improvements in km 17/300- 21/300, km 22/200-26/0, km 26/600 - 28/0, km 28/60-30/8, km 31/700 - 33/100, km 33
Cutting, uprooting and removal of trees for the work of widening to 2l ps in km 15/600-38/800 (except km 28/2-28/6 and km 33/100-33/200) and improvements in km 17/300- 21/300, km 22/200-26/0, km 26/600 - 28/0, km 28/60-30/8, km 31/700 - 33/100, km 33
Read moreUp-gradation existing 2 lane highway to 4 lane with construction of elevated 4 lane fly over at section talegaon to chakan from ch. 0/00 to 28/300 and up gradation of 6 lane highway chakan to shikrapur at grade from ch.28/300 to 53/20
Up-gradation existing 2 lane highway to 4 lane with &#x0d construction of elevated 4 lane fly over at section &#x0d talegaon to chakan from ch. 0/00 to 28/300 and up&#x0d gradation of 6 lane highway chakan to shikrapur at grade &#x0d from ch.28/300 to 53/20
Read moreUpgradation of construction of six lane highway corridor from ch. 8/500 to 33/500 and upgradation of existing highway to six lanes from ch. 8/500 to 40/00 section at grade section of hadapsar yevat (nh-65) in the state of maharashtra
Upgradation of construction of six lane highway corridor &#x0d from ch. 8/500 to 33/500 and upgradation of existing &#x0d highway to six lanes from ch. 8/500 to 40/00 section at&#x0d grade section of hadapsar yevat (nh-65) in the state of &#x0d maharashtra
Read moreof your Industry type