Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Core Sample Required For Scientific Study Report Of Cm 4 And Cm 5 Pannel In L 1 B Seam At Vindhya Ug Mine, Pinoura Sub Area, Johilla Area
|
| Description |
Core Sample Required For Scientific Study Report Of Cm 4 And Cm 5 Pannel In L 1 B Seam At Vindhya Ug Mine, Pinoura Sub Area, Johilla Area
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_SECL_315939_1 |
|
Reference Number |
SECL/GM/JOH/Survey/ eTender/24-25/ 17 dt-26/08/2024 |
| Tender Fee | 0 |
| EMD | 5000 |
| Tender Value | |
| Place | Vindhya UG Mine |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=327405 |
| Start Date | August 27, 2024 15:30 |
| End Date |
Expired
07/09/2024
Expired 663 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Cleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Read moreCore sample required for scientific study report of cm-4 and cm-5 pannel in l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Core sample required for scientific study report of cm-4 and cm-5 pannel in l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Read moreFall cleaning and roof bolting for preparation of cm-4 panel in l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Fall cleaning and roof bolting for preparation of cm-4 panel in l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Read moreShifting of 04 nos. sub station including all accessories for depillaring of cm-4a, cm-4b and cm-5 pannel of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Shifting of 04 nos. sub station including all accessories for depillaring of cm-4a, cm-4b and cm-5 pannel of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Read moreConstruction of 08 nos. isolation stoppings in proposed depillaring panel cm-16 of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Construction of 08 nos. isolation stoppings in proposed depillaring panel cm-16 of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Read moreInstallation of 06 nos. main belt conveyor and 04 nos pony belt conveyor for depillaring of cm-4 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Installation of 06 nos. main belt conveyor and 04 nos pony belt conveyor for depillaring of cm-4 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Read moreProviding and fixing of subsidence pillars at surface over the depillaring panels cm-14, cm-15 and cm-16 of l-1b seam at vindhya ug mine, pinoura sub area of johilla area
Providing and fixing of subsidence pillars at surface over the depillaring panels cm-14, cm-15 and cm-16 of l-1b seam at vindhya ug mine, pinoura sub area of johilla area
Read moreShifting of 03 nos. sub station including all accessories for depillaring of cm-15 and cm-16 panel of l-1b seam at vindhya u/g mine, pinoura sub area, johilla area
Shifting of 03 nos. sub station including all accessories for depillaring of cm-15 and cm-16 panel of l-1b seam at vindhya u/g mine, pinoura sub area, johilla area
Read moreConstruction of 13 nos. isolation stoppings in proposed depillaring panel cm-4a and cm-4b and plastering of 14 nos. old isolation stoppings of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Construction of 13 nos. isolation stoppings in proposed depillaring panel cm-4a and cm-4b and plastering of 14 nos. old isolation stoppings of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Read moreInstallation of 03 nos. main belt conveyor and 03 nos. nos pony belt conveyor for depillaring of cm-15 and cm-16 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Installation of 03 nos. main belt conveyor and 03 nos. nos pony belt conveyor for depillaring of cm-15 and cm-16 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Read moreof your Industry type