Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting Of 04 Nos. Sub Station Including All Accessories For Depillaring Of Cm 4 A, Cm 4 B And Cm 5 Pannel Of L 1 B Seam At Vindhya Ug Mine, Pinoura Sub Area, Johilla Area
|
| Description |
Shifting Of 04 Nos. Sub Station Including All Accessories For Depillaring Of Cm 4 A, Cm 4 B And Cm 5 Pannel Of L 1 B Seam At Vindhya Ug Mine, Pinoura Sub Area, Johilla Area
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_SECL_333189_1 |
|
Reference Number |
SECL/GM/JOH/Survey/ eTender/24-25/ 34 dt-24/03/2025 |
| Tender Fee | 0 |
| EMD | 10800 |
| Tender Value | - |
| Place | Vindhya UG Mine |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345394 |
| Start Date | March 25, 2025 15:30 |
| End Date |
Expired
05/04/2025
Expired 559 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 13 nos. isolation stoppings in proposed depillaring panel cm-4a and cm-4b and plastering of 14 nos. old isolation stoppings of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Construction of 13 nos. isolation stoppings in proposed depillaring panel cm-4a and cm-4b and plastering of 14 nos. old isolation stoppings of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Read moreConstruction of 08 nos. isolation stoppings in proposed depillaring panel cm-16 of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Construction of 08 nos. isolation stoppings in proposed depillaring panel cm-16 of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Read moreCore sample required for scientific study report of cm-4 and cm-5 pannel in l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Core sample required for scientific study report of cm-4 and cm-5 pannel in l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Read moreCore sample required for scientific study report of cm-4 and cm-5 pannel in l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Core sample required for scientific study report of cm-4 and cm-5 pannel in l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Read moreInstallation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Read moreProviding and fixing of subsidence pillars at surface over the depillaring panels cm-14, cm-15 and cm-16 of l-1b seam at vindhya ug mine, pinoura sub area of johilla area
Providing and fixing of subsidence pillars at surface over the depillaring panels cm-14, cm-15 and cm-16 of l-1b seam at vindhya ug mine, pinoura sub area of johilla area
Read moreShifting of 03 nos. sub station including all accessories for depillaring of cm-15 and cm-16 panel of l-1b seam at vindhya u/g mine, pinoura sub area, johilla area
Shifting of 03 nos. sub station including all accessories for depillaring of cm-15 and cm-16 panel of l-1b seam at vindhya u/g mine, pinoura sub area, johilla area
Read moreTransportation, laying and fixing of 4 inch dia. pipeline for supplying water for cm machine operation in proposed depillaring panel cm-4a, cm-4b and cm-5 panel at vindhya ug mine, pinoura sub area, johilla area
Transportation, laying and fixing of 4 inch dia. pipeline for supplying water for cm machine operation in proposed depillaring panel cm-4a, cm-4b and cm-5 panel at vindhya ug mine, pinoura sub area, johilla area
Read moreFall cleaning and roof bolting for preparation of cm-4 panel in l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Fall cleaning and roof bolting for preparation of cm-4 panel in l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Read moreof your Industry type