Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Renovation Of Berms By Way Of Filling Dressing Levelling And Compaction Including Construction Of Block By Way Of Cement Concrete And Curb Stones Part A At I.G.C, Lassipora
|
| Description |
Renovation Of Berms By Way Of Filling Dressing Levelling And Compaction Including Construction Of Block By Way Of Cement Concrete And Curb Stones Part A At I.G.C, Lassipora
|
| Organisation | SIDCO | State Govt. and UT |
| Tender Id | 2026_SIDCO_307790_2 |
|
Reference Number |
SIDCO/IGCL/Tend/026/01 |
| Tender Fee | 2000 |
| EMD | 49900 |
| Tender Value | - |
| Place | Pulwama |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=999022 |
| Start Date | April 20, 2026 14:30 |
| End Date |
Expired
25/04/2026
Expired 173 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
8. engaging of jcb, blade tractor for levelling of high berms and supply , filling of stone dust at various locations on the occasion of bathukamma , dussera celebrations in narsampet municipality under municipal general fund
8. engaging of jcb, blade tractor for levelling of high berms and supply , filling of stone dust at various locations on the occasion of bathukamma , dussera celebrations in narsampet municipality under municipal general fund
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreFacility management services - lump sum based - preparation of ground filling providing curb stones
Read more
Leveling by earth mover,levelling by earth movers,soil filling,levelling and compaction of filled s
Read more
Earth mover work, tractor trolley for digging,soil filling,levelling of land,compaction,ground prep
Read more
Dressing, filling and levelling of soil for parking area in front of ipd at aiims
Dressing, filling and levelling of soil for parking area in front of ipd at aiims patna
Read moreLand development by way of earth filling and levelling at map nursery verinag anantnag
Land development by way of earth filling and levelling at map nursery verinag anantnag
Read morePlayfield by the way of filling ,levelling and allied works at govt. hs muthi
Playfield by the way of filling ,levelling and allied works at govt. hs muthi
Read moreDevelopment of playfield by way of earth filling and levelling at mp hss srinagar.
Development of playfield by way of earth filling and levelling at mp hss srinagar.
Read moreDevelopment of play field by way of chain link fencing earth filling levelling approach road
Development of play field by way of chain link fencing earth filling levelling approach road
Read moreof your Industry type