Supplying All Materials, Labour, Tand P For Power Supply To Rwss Point Including 3ph3 W 11 Kv Line With 55mm2 Aaac And Installation Of 1 No 25 Kva 11/0.4 Kv S/S Transformer Etc For Rpws Point To Village Nachhibindha Under Basudevpur Block
|
Description |
Supplying All Materials, Labour, Tand P For Power Supply To Rwss Point Including 3ph3 W 11 Kv Line With 55mm2 Aaac And Installation Of 1 No 25 Kva 11/0.4 Kv S/S Transformer Etc For Rpws Point To Village Nachhibindha Under Basudevpur Block
|
Organisation | Rural Water Supply and Sanitation | State Govt. and UT |
Tender Id | 2025_RWSS_111673_1 |
Reference Number |
SE RWSandS BDK 06/2024-25 Dt-04.03.2025 |
Tender Fee | 4000 |
EMD | 9316 |
Tender Value | |
Place | Nachhibindha under Basudevpur Block |
Link | https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=533163 |
Start Date | March 13, 2025 21:30 |
End Date |
25/03/2025 ( Expired 70 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supplying all materials, labour, t and p etc. and execution of rpws to village chitrakonda (70 lpcd retrofitting) of chitrakonda block under malkangiri district with 05 years operation and maintenance
Supplying all materials, labour, t and p etc. and execution of rpws to village chitrakonda (70 lpcd retrofitting) of chitrakonda block under malkangiri district with 05 years operation and maintenance
Read moreTender for providing of sop to lis bah sihan at village goda in gp gagal by providing 63 kva, 22/0.4 kv s/stn along with 22 kv ht lt line in (e) section gagal under esd ner chowk.
Tender for providing of sop to lis bah sihan at village goda in gp gagal by providing 63 kva, 22/0.4 kv s/stn along with 22 kv ht lt line in (e) section gagal under esd ner chowk.
Read moreConstruction of 3 wire, 3 phase, 11/0.4 kv lt electric line with 9.00 mtr 150 x 150 rs joist pole and 3 phase transformer (sub station) 11/0.4 kva including installation with all required materials etc. all complete (reach-iii)
Construction of 3 wire, 3 phase, 11/0.4 kv lt electric line with 9.00 mtr 150 x 150 rs joist pole and 3 phase transformer (sub station) 11/0.4 kva including installation with all required materials etc. all complete (reach-iii)
Read moreErection of 3.3kv o/h line from 10 no substation to cocp excavated patch for power supply to pump and installation of 100 kva, 3.3kv/440v lighting transformer along with erection of 440volt o/h line for lighting at cocp pumping station of sarubera
Erection of 3.3kv o/h line from 10 no substation to cocp excavated patch for power supply to pump and installation of 100 kva, 3.3kv/440v lighting transformer along with erection of 440volt o/h line for lighting at cocp pumping station of sarubera
Read moreTender for replacement of lt line bare conductor with cable passing over the house of sh. tek chand , ram singh , mansa ram in village beh (in mla deposit) from existing 315 kva ,11/0.4 kv s/stn veterinary in electrical section gagal under esd , hpse
Tender for replacement of lt line bare conductor with cable passing over the house of sh. tek chand , ram singh , mansa ram in village beh (in mla deposit) from existing 315 kva ,11/0.4 kv s/stn veterinary in electrical section gagal under esd , hpse
Read moreFor the work of replacement of old and damaged lt bushing rod including oil seal/gaskets etc. (250 to 1000 kva transformer) under 11 kv and lt line- north, meerut.
For the work of replacement of old and damaged lt bushing rod including oil seal/gaskets etc. (250 to 1000 kva transformer) under 11 kv and lt line- north, meerut.
Read moreTender for prov. sop to lift irrigation scheme proposed for fagog banjholi of various cluster package-6 of hp shiva project by prov. 63 kva 11/0.4 kv s/stn. fagog a/w ht and lt line in es balhseena under esd hpsebl, berthin
Tender for prov. sop to lift irrigation scheme proposed for fagog banjholi of various cluster package-6 of hp shiva project by prov. 63 kva 11/0.4 kv s/stn. fagog a/w ht and lt line in es balhseena under esd hpsebl, berthin
Read moreEstimate for providing 22 kv ht line to installation of 2x400 kva 22 0.4 kv transformer at zone-5 in e section chunahan under electrical sub division hpsebl baggi.
Estimate for providing 22 kv ht line to installation of 2x400 kva 22 0.4 kv transformer at zone-5 in e section chunahan under electrical sub division hpsebl baggi.
Read moreInstallation of 250 kva sub-station and extension of 11 kv line for providing power supply to pathani samanta auditorium, nayagarh
Installation of 250 kva sub-station and extension of 11 kv line for providing power supply to pathani samanta auditorium, nayagarh
Read moreInstallation of 250 kva sub-station and extension of 11 kv line for providing power supply to pathani samanta auditorium, nayagarh
Installation of 250 kva sub-station and extension of 11 kv line &#x0d for providing power supply to &#x0d pathani samanta auditorium, nayagarh&#x0d