Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Civil M R Works In Gulbarga Sa
|
Description |
Civil M R Works In Gulbarga Sa
|
Organisation | Hindustan Petroleum Corporation Limited | Public Sector Undertakings |
Tender Id | 127724 |
Reference Number |
2400015474-HB-07062 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | GULBARGA |
Link | http://tenders.hpcl.co.in/tenders/tender_prog/Tenders_details.asp?id=127724 |
Start Date | August 28, 2024 15:30 |
End Date |
12/09/2024 ( Expired 296 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreAAAAAAAAAA
Login to viewEoi for empanelment of architects for various construction works in dr. b.r.ambedkar nit,jalandhar
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreConstruction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam
Construction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam
Read moreLt/b885-078-pm-t-9801/1001 - coke drum replacement, allied modernization and piping works in delayed coker unit of panipat refinery at iocl, panipat
Coke drum replacement, allied modernization and piping works in delayed coker unit of panipat refinery at iocl, panipat
Read moreDevelopment, operation and maintenance of wayside amenities of jodhpur ring road section of nh-125a in the state of rajasthan 2 o-m sitesnh-125a/karwar/ch. 73-620/lhs
Development, operation and maintenance of wayside amenities of jodhpur ring road section of nh-125a in the state of rajasthan 2 o-m sitesnh-125a/karwar/ch. 73-620/lhs
Read moreConstruction of various 220 kv transmission lines associated with 220kv gss bambloo (dist-bikaner) including survey, supply of all equipments/materials, erection (including civil works), testing and commissioning (turnkey project) bn9019002517
Construction of various 220 kv transmission lines associated with 220kv gss bambloo (dist-bikaner) including survey, supply of all equipments/materials, erection (including civil works), testing and commissioning (turnkey project) bn9019002517
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreBtps(4x270mw)
Design, engineering, manufacture, supply, assembly, testing at manufacturers works, inspection, packing for inland freight, forwarding, transit insurance, delivery for site, erection, supervision, testing and commissioning of new conveying system for di of raw coal including modification works in the existing crusher house and construction of space frame structure raw coal storage shed with all accessories, mandatory spares, tools and tackles including all mechanical, electrical, cni, civil, structural works, dust suppression, dust extraction and fire fighting system at btps(4x270mw) project.
Read moreof your Industry type