Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling And Repairing Of Two Nos. Main Gate, Material Handling And Bushes Cutting At Regional Store Godhur Under Kusunda Area
|
| Description |
Dismantling And Repairing Of Two Nos. Main Gate, Material Handling And Bushes Cutting At Regional Store Godhur Under Kusunda Area
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2024_BCCL_323807_1 |
|
Reference Number |
BCCL/AVI/EnM/2024-25/178 |
| Tender Fee | 0 |
| EMD | 759 |
| Tender Value | - |
| Place | Kusunda Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=335642 |
| Start Date | December 21, 2024 16:30 |
| End Date |
Expired
01/01/2025
Expired 652 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, cutting, handling, loading, shifting of old and unserviceable electrical items
Dismantling, cutting, handling, loading, shifting of old and unserviceable electrical items
Read moreMiscellaneous jobs of 100t dumper section-lubricant handling for to-fro movement of oil drum from regional store and 100t dumper section and disposal of scrap items of 100t dumper section, cleaning/washing of 100t dumpers and operator cabin and both
Miscellaneous jobs of 100t dumper section-lubricant handling for to-fro movement of oil drum from regional store and 100t dumper section and disposal of scrap items of 100t dumper section, cleaning/washing of 100t dumpers and operator cabin and both
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreNozzle torch, gas cutting,bolt, hex, ms, 4.6 full, 1 in, 9 in, w-nut,block, ms, 16 in, 10 in, 1.5 in, with gm bush,bush gm, od-6 in id-4 in, l-8 in, f- haulage,balance valve,bearing housing de and nde,set of two bearing bushes,earth leakage relay with digital leakage,oil ring for bearing de 100 x 125 mla 368,shaft sleeve de bronze,shaft sleeve nde br - 27,pinion, 26 teeth en 24
Nozzle torch, gas cutting,bolt, hex, ms, 4.6 full, 1 in, 9 in, w-nut,block, ms, 16 in, 10 in, 1.5 in, with gm bush,bush gm, od-6 in id-4 in, l-8 in, f- haulage,balance valve,bearing housing de and nde,set of two bearing bushes,earth leakage relay with digital leakage,oil ring for bearing de 100 x 125 mla 368,shaft sleeve de bronze,shaft sleeve nde br - 27,pinion, 26 teeth en 24
Read moreConstruction of platforms, earthwork/ blanketing in formation/cutting, retaining wall & drain, rub, fob, minor bridge (br.no.466/2, 467/1, 467/2, 467/3, 467/4, 467/4, 468/1, 468/2, 469/1), station building(g+1) and station building compound wall, water tank, toilet, rub pump house, road, etc. work and dismantling and track works for nimbhora yard remodelling, including ballast supply in connection with bsl-knw 3rd and 4th line (131km) project of central railway. (two packet system).
Construction of platforms, earthwork/ blanketing in formation/cutting, retaining wall & drain, rub, fob, minor bridge (br.no.466/2, 467/1, 467/2, 467/3, 467/4, 467/4, 468/1, 468/2, 469/1), station building(g+1) and station building compound wall, water tank, toilet, rub pump house, road, etc. work and dismantling and track works for nimbhora yard remodelling, including ballast supply in connection with bsl-knw 3rd and 4th line (131km) project of central railway. (two packet system).
Read moreApplying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Read moreSupply and fitting250amps mccb switch at regional store godhur under kusunda area.
Supply and fitting250amps mccb switch at regional store godhur under kusunda area.
Read moreFencing of boundary wall through barbed wire at regional store godhur under kusunda area
Fencing of boundary wall through barbed wire at regional store godhur under kusunda area
Read moreRepair work of tata hyva reg.no-jh10af-3532 of regional store godhur, kusunda area
Repair work of tata hyva reg.no-jh10af-3532 of regional store godhur, kusunda area
Read moreDismantling, cutting, testing and re-jointing of 70 sq.mm copper cable approx. 100 mtr. length at regional store, godhur
Dismantling, cutting, 
 testing and re-jointing 
 of 70 sq.mm copper 
 cable approx. 100 mtr. 
 length at regional 
 store, godhur
Read moreof your Industry type