Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improvement And Rehabilitation Of Existing Damaged Pavement (5.50 M Carriageway) Of Nh127 C Under Nh (O) From Chainage 15.00 Km To Chainage 40.190 Km (Total Length 25.190 Km) Under Abhayapuri Construction Division.
|
| Description |
Improvement And Rehabilitation Of Existing Damaged Pavement (5.50 M Carriageway) Of Nh127 C Under Nh (O) From Chainage 15.00 Km To Chainage 40.190 Km (Total Length 25.190 Km) Under Abhayapuri Construction Division.
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_830167_1 |
|
Reference Number |
NHR.39/2024/5 |
| Tender Fee | 10000 |
| EMD | 12.75 Lakh |
| Tender Value | - |
| Place | Abhayapuri |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=872362 |
| Start Date | October 10, 2024 19:30 |
| End Date |
Expired
30/10/2024
Expired 715 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rehabilitation and upgradation of malkapur buldhana chikhli deulgaon raja jalna sambhaji nagar nh 753a upgradation of service road at vup at chainage 150.400 on jalna bypass
Rehabilitation and upgradation of malkapur buldhana chikhli deulgaon raja jalna sambhaji nagar nh 753a upgradation of service road at vup at chainage 150.400 on jalna bypass
Read moreRehabilitation and up-gradation to 2-lane configuration of kanda to bageshwar road from km 103.25 to km 122.72 (existing chainage 110 to km 130) of nh-309a in the state of uttarakhand (package-ll) under nh(o)
Rehabilitation and up-gradation to 2-lane configuration of kanda to bageshwar road from km 103.25 to km 122.72 (existing chainage 110 to km 130) of nh-309a in the state of uttarakhand (package-ll) under nh(o)
Read moreShort term maintenance to nh-17(new) / nh-31(old) for the year 2026-27 from (i) km 816/012 to km 829/000 (length 13.094 km) (ii) km 844/000 to km 858/000 (length 12.506 km) (total length of the project 25.600 km) under abhayapuri const. division
Short term maintenance to nh-17(new) / nh-31(old) for the year 2026-27 from (i) km 816/012 to km 829/000 (length 13.094 km) (ii) km 844/000 to km 858/000 (length 12.506 km) (total length of the project 25.600 km) under abhayapuri const. division
Read moreRehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of orai barah section of nh27 from ex. km 1515.713 to km 1578.383 in the state of uttar pradesh on ham (total length 62.670 km).
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of orai barah section of nh27 from ex. km 1515.713 to km 1578.383 in the state of uttar pradesh on ham (total length 62.670 km).
Read moreRehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-2) from design km 1423.000 sultanpura village to design km 1469.000 near ingui khurd village nh-27 in up on ham mode. (tl46.000 kms).
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-2) from design km 1423.000 sultanpura village to design km 1469.000 near ingui khurd village nh-27 in up on ham mode. (tl46.000 kms).
Read moreRehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi-orai sec. (pkg-1) from design km 1378.915 near jhansi (sijwaha tiraha nh27) to design 1423.000 near sultanpura village nh-27 in up on ham mode. (tl44.085 kms)
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi-orai sec. (pkg-1) from design km 1378.915 near jhansi (sijwaha tiraha nh27) to design 1423.000 near sultanpura village nh-27 in up on ham mode. (tl44.085 kms)
Read moreRehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.
Read moreRisk and cost work for work of sarvardevla to pal (mp/mh border) road section of nh-347c from design chainage 81.600 km to 137.400 km (total length 55.80 km) in the state of madhya pradesh
Risk and cost work for work of sarvardevla to pal (mp/mh border) road section of nh-347c from design chainage 81.600 km to 137.400 km (total length 55.80 km) in the state of madhya pradesh
Read moreRehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreRehabilitation and upgradation of two lane road with paved shoulders on malegaon missing link section of nh461b from akola naka to junction with nh 161 at malegaon bypass (from km 0.00 to 3.00 total length 3.00 km) and 0.00 to 0.460 length of nh753c
Rehabilitation and upgradation of two lane road with paved shoulders on malegaon missing link section of nh461b from akola naka to junction with nh 161 at malegaon bypass (from km 0.00 to 3.00 total length 3.00 km) and 0.00 to 0.460 length of nh753c
Read moreof your Industry type