Tender Details
Particulars | Details |
---|---|
Title |
Installation Of Solar Submerssible With Pipe Line At Dharampur Uttar Para At Sansad No Xvi
|
Description |
Installation Of Solar Submerssible With Pipe Line At Dharampur Uttar Para At Sansad No Xvi
|
Organisation | Zilla Parishad | State Govt. and UT |
Tender Id | 2025_ZPHD_801950_4 |
Reference Number |
15/MGP/15 TH CFC/2024-2025 |
Tender Fee | 7 |
EMD | 5873 |
Tender Value | |
Place | DHARAMPUR |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1780803 |
Start Date | January 16, 2025 23:30 |
End Date |
24/01/2025 ( Expired 118 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Read moreSupply, installation, testing, commissioning of hospital laundy equipment on turnkey basis with 02 years comprehensive warranty on buy-back basis and operation of laundry services for a period of 10 years at aiims, new delhi
Tender for supply, installation, testing, and
 commissioning of hospital laundry equipment on
 turnkey basis with 02 years comprehensive
 warranty on buy-back basis and operation of
 laundry services for a period of 10 years at aiims.
Read moreSupply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Supply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreCa no cwe bly ge w 07 of 2025 26 provn of roof top solar plants totaling 200 kw at certain bldgs at bareilly under ge west bareilly
Ca no cwe bly ge w 07 of 2025 26 provn of roof top solar plants totaling 200 kw at certain bldgs at bareilly under ge west bareilly
Read moreDesign, supply, installation and commissioning with three (03) years comprehensive maintenance of dynamic creative illumination at maithon and panchet dam and various fountains proposed at maithon dam
Design, supply, installation and commissioning with three (03) years comprehensive maintenance of dynamic creative illumination at maithon and panchet dam and various fountains proposed at maithon dam
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreSupply, installation, testing and commissioning of table-top afm/stm system for ambient operation with vibration isolation stage and advanced imaging options
Supply,&#x0d installation, testing and commissioning of table-top afm/stm system for ambient operation with&#x0d vibration isolation stage and advanced imaging options at the department of physics, kannur university (under pm usha scheme)
Read moreof your Industry type