Tender Details
Particulars | Details |
---|---|
Title |
Wbiw/Ee/Mid/E Nit 19/2023 24
|
Description |
Cleaning And Removal Of Water Hyacinth From Behula Drainage Channel Including One Year Amc From Nh Bridge Ch. 0.00 Km Towards Us Ch. 3.00km At South Jalanga
|
Organisation | IRRIGATION AND WATERWAYS DEPT. | State Govt. and UT |
Tender Id | 2024_IWD_671516_1 |
Reference Number |
WBIW/EE/MID/eNIT-19/2023-24 |
Tender Fee | 0 |
EMD | 17477 |
Tender Value | |
Place | South Jalanga G.P-Mangalbari, Block - Old Malda |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1459001 |
Start Date | February 22, 2024 15:30 |
End Date |
29/02/2024 ( Expired 446 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreOne time clearance of water hyacinth, jungle and deposition in canal bed from raiganj bus stand up to south birnagar ankush club at ward no-21 and 23 under raiganj municipality
One time clearance of water hyacinth, jungle and deposition in canal bed from raiganj bus stand up to south birnagar ankush club at ward no-21 and 23 under raiganj municipality
Read morePr of road from machmara kumarghat kn road to south dhanicherra panchyet office road via parbojay para awc during the year 2025 2026 total length 0 800 km sh patch solling patch mettaling carpeting and seal coat work from ch 0 00 km to 0 900 k
Pr of road from machmara kumarghat kn road to south dhanicherra panchyet office road via parbojay para awc during the year 2025 2026 total length 0 800 km sh patch solling patch mettaling carpeting and seal coat work from ch 0 00 km to 0 900 k
Read moreMtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km
Mtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km
Read morePr of road from nh 08 ptl petrol pump to ptl railway station road l 1 00 km during the year 2025 26 sh surface drain patch metalling carpeting seal coat and protection works from ch 0 00 km to ch 1 00km
Pr of road from nh 08 ptl petrol pump to ptl railway station road l 1 00 km during the year 2025 26 sh surface drain patch metalling carpeting seal coat and protection works from ch 0 00 km to ch 1 00km
Read morePr of road from nh 208 road to joyganti para via nakulsingh debbarma house during the year 2025 26 sh soling carpeting and seal coat etc from ch 0 45 km to 1 00 km
Pr of road from nh 208 road to joyganti para via nakulsingh debbarma house during the year 2025 26 sh soling carpeting and seal coat etc from ch 0 45 km to 1 00 km
Read moreof your Industry type