Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Carrying Out The Id Fan Hoist Maintenance Platform Modification Works In Boiler Unit 1 And Unit 2 At 2 X800 Mw Ntpc Ramagundam
|
| Description |
Carrying Out The Id Fan Hoist Maintenance Platform Modification Works In Boiler Unit 1 And Unit 2 At 2 X800 Mw Ntpc Ramagundam
|
| Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
| Tender Id | 2025_BHEL_50217_1 |
|
Reference Number |
BHE/PW/PUR/RGMT/ID Fan/83 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | 2X800MW, TeSTPP, NTPC, Ramagundam |
| Link |
View Original Tender Notice
https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=53873 |
| Start Date | July 02, 2025 18:30 |
| End Date |
Expired
12/07/2025
Expired 464 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cane cutter,fibrizer,boiler fd fan,boiler id fan,bagasilo blower,nk 1301 continuous machine,nk 1100 continuous machine,boiler no 3 spreyder
Cane cutter,fibrizer,boiler fd fan,boiler id fan,bagasilo blower,nk 1301 continuous machine,nk 1100 continuous machine,boiler no 3 spreyder
Read moreProviding scaffolding and surface preparation for carrying out rla study in boiler 6 at energy - mechanical in tnpl unit-i
Providing scaffolding and surface preparation for carrying out rla study in boiler 6 at energy - mechanical in tnpl unit-i
Read moreCarrying out the work of identifying and rectifying of air ingress in the tube bundles of acc fan #1 to #10 in the acc system
Carrying out the work of identifying and rectifying of air ingress in the tube bundles of acc fan #1 to #10 in the acc system
Read moreProcurement of 100 nb ms pipes to replace damaged bracing pipes in both unit boiler ducts (aph, esp and id fan inlet/outlet ducts) in aoh at stpp, jaipur, mancherial, telangana
Procurement of 100 nb ms pipes to replace damaged bracing pipes in both unit boiler ducts (aph, esp and id fan inlet/outlet ducts) in aoh at stpp, jaipur, mancherial, telangana
Read moreCarrying out repairs for strengthening, sandblasting and painting with anti-corrosive coating for intake service gates of unit # 5 (two gates) and painting of stop log gates (22 elements) and lifting beam of mono rail hoist available at intake gates of pjhes with anti-corrosive paint
Carrying out repairs for strengthening, sandblasting and painting with anti-corrosive coating for intake service gates of unit # 5 (two gates) and painting of stop log gates (22 elements) and lifting beam of mono rail hoist available at intake gates of pjhes with anti-corrosive paint
Read moreCarrying out balance structure works in boiler unit-1 of 2x800mw ntpc ramagundam
Carrying out balance structure works in boiler unit-1 of 2x800mw ntpc ramagundam
Read moreCarrying out miscellaneous structure works in boiler unit-1 of 2x800mw ntpc ramagundam
Carrying out miscellaneous structure works in boiler unit1 of 2x800mw ntpc ramagundam
Read moreCarrying out balance structure works in boiler unit-1 of 2x800mw ntpc ramagundam
Carrying out balance structure works in boiler unit-1 of 2x800mw ntpc ramagundam
Read moreCarrying out misc. balance works in boiler unit-1 of 2x800mw ntpc ramagundam
Carrying out misc. balance works in boiler unit-1 of 2x800mw ntpc ramagundam
Read moreCarrying out bunker hoist monorail modification work in unit-1 2 of 2x800 mw ntpc ramagundam
Carrying out bunker hoist monorail modification work in unit-1 2 of 2x800 mw ntpc ramagundam
Read moreof your Industry type