Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Di Khul(ahajibal Dara) From Game Khul To Onwards At Ahajibal
|
| Description |
Construction Of Di Khul(ahajibal Dara) From Game Khul To Onwards At Ahajibal
|
| Organisation | Rural Development and Panchayati Raj | State Govt. and UT |
| Tender Id | 2024_RDPR_268403_3 |
|
Reference Number |
104 of 2024-25 |
| Tender Fee | 200 |
| EMD | 4430 |
| Tender Value | - |
| Place | budgam |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=827742 |
| Start Date | December 19, 2024 14:30 |
| End Date |
Expired
24/12/2024
Expired 640 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Godavari pushkaralu 2027 construction of a cc road from main ghat to saraswathi ghat with central lighting at kaleshwaram (v) mahadevpur (m) jayashankar bhupalpally district
Godavari pushkaralu 2027 construction of a cc road from main ghat to saraswathi ghat with central lighting at kaleshwaram (v) mahadevpur (m) jayashankar bhupalpally district
Read moreConstruction of additional class rooms to mini gurukulam at mamda (v) of mamda (m) in nirmal district
Construction of additional class rooms to mini gurukulam at mamda (v) of mamda (m) in nirmal district
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreRblisp liftii operation and maintenance of rblis lift-ii stage-i pumping station at thirumalayapally (v), madanapur (m) and stage-ii pumping station at kothakota (v,m), wanaparthy (dist) for the year 2026-27 (from 01.10.2026 to 30.09.2027)
Rblisp liftii operation and maintenance of rblis lift-ii stage-i pumping station at thirumalayapally (v), madanapur (m) and stage-ii pumping station at kothakota (v,m), wanaparthy (dist) for the year 2026-27 (from 01.10.2026 to 30.09.2027)
Read moreOperation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreOperation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreDevelopment of game khul at spots from hatchdoub to onwards
Development of game khul at spots from hatchdoub to onwards
Read moreDevelopment of game khul at spots from woomen nallah to onwards
Development of game khul at spots from woomen nallah to onwards
Read moreof your Industry type