Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling Of Existing Lt Oh Line To Provide Free Space For Dumping At Departmental Working Patch At Ashok Open Cast Project Under Piparwar Area.
|
| Description |
Dismantling Of Existing Lt Oh Line To Provide Free Space For Dumping At Departmental Working Patch At Ashok Open Cast Project Under Piparwar Area.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_291824_1 |
|
Reference Number |
PO(AK)/PE(EnM)/e-NIT/23-24/78 |
| Tender Fee | - |
| EMD | 800 |
| Tender Value | - |
| Place | Ashok OCP, Piparwar Area Chatra, Jharkhand-829201 |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | October 21, 2023 14:30 |
| End Date |
Expired
31/10/2023
Expired 1025 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair maintenance of external water supply pipe line pumpset and cleaning of borewell sump etc at zone a area under ge navy chennai
Repair maintenance of external water supply pipe line pumpset and cleaning of borewell sump etc at zone a area under ge navy chennai
Read moreTurnkey contract for construction of 01 no new 33kv line at gaya ji of sbpdcl to provide connectivity and electrical infrastructure for 3 nos. of proposed pss for integrated manufacturing centre (imc), gaya ji, bihar for amritsar kolkata integrated centre (akic), gamhariaunder (state plan) with all associated works under sbpdcl
Turnkey contract for construction of 01 no new 33kv line at gaya ji of sbpdcl to provide connectivity and electrical infrastructure for 3 nos. of proposed pss for integrated manufacturing centre (imc), gaya ji, bihar for amritsar kolkata integrated centre (akic), gamhariaunder (state plan) with all associated works under sbpdcl
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreRelocation of lt oh line by dismantling and erection of lt oh line towards benti basti under ashok ocp, piparwar area
Relocation of lt oh line by dismantling and erection of lt oh line towards benti basti under ashok ocp, piparwar area
Read moreDismantling of existing 8 inch and 10 inch dia ms pipe delivery ranges for providing free space for coal exposer at patch a area in ashok ocp under piparwar area.
Dismantling of existing 8 inch and 10 inch dia ms pipe delivery ranges for providing free space for coal exposer at patch a area in ashok ocp under piparwar area.
Read morePartial diversion of a section of existing feeder nos. 01 and 05, 3.3kv overhead line for providing free space for overburden dumping near new sainik view point area at ashok project under piparwar area..
Partial diversion of a section of existing feeder nos. 01 and 05, 3.3kv overhead line for providing free space for overburden dumping near new sainik view point area at ashok project under piparwar area.
Read moreErection of lt overhead line for updating lighting arrangement at departmental working patch, internal ob dumping yard, haul roads and coal stock yard of gondegaon open cast mine
Erection of lt overhead line for updating
 lighting arrangement at departmental working
 patch, internal ob dumping yard, haul roads
 and coal stock yard of gondegaon open cast
 mine
Read moreLt overhead line from patch a area to quarry 02 area and on top bench of sainik working patch in old bijan village for providing illumination at different working places in mines at ashok ocp under piparwar area.
Lt overhead line from patch a area to quarry 02 area and on top bench of sainik working patch in old bijan village for providing illumination at different working places in mines at ashok ocp under piparwar area.
Read moreRepairing of boundary wall near washing platform gate no.02 at piparwar workshop under ashok open cast project piparwar area.
Repairing of boundary wall near washing platform gate no.02 at piparwar workshop under ashok open cast project piparwar area.
Read moreof your Industry type