Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
N Ie T 57/23 24/08
|
| Description |
Construction Of Temporary Structures For Medical Staff, Near Wind Mill And Temporary Special Latrine At Different Places Of Ganga Sagar Mela Ground In Connection With Gs Mela 2024 Under Kakdwip Sub Division Of Alipore Division, P.H. Engineering Dte.
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_PHED_598754_8 |
|
Reference Number |
WBPHED/EE/NIeT-57/AD/2023-2024 |
| Tender Fee | - |
| EMD | 15465 |
| Tender Value | - |
| Place | O/O the Executive Engineer Alipore Divn PHE |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | November 03, 2023 16:30 |
| End Date |
Expired
22/11/2023
Expired 1038 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreNiet-57/23-24/06
Construction of temporary structures for other govt. officials in connection with g.s mela-2024 under kakdwip sub-division of alipore division, p.h. engineering dte.
Read moreNiet-57/23-24/01
Construction of temporary hogla structure (helipad ground) and laying brick flat soling (11 nos. a type police structure adjacent to sea beach) at sagar mela ground in connection with g.s. mela - 2024 under kakdwip sub-division, phe dte.
Read moreNiet-57/23-24/02
Construction of temporary structures for press, labour shed, disposal of solid waste garbage at mela ground and temporary special latrine at different places of ganga sagar mela ground including maintenance of latrine in connection with g.s mela 2024
Read moreNiet-57/23-24/13
Fitting, fixing fire hydrant lending (fhl) valve on the existing pipe line, fixing bamboo post for demarcation for fire fighting and allied works (for zone-i area) in connection with g.s. mela 2024 under kakdwip sub-division, p.h.e dte.
Read moreNiet-57/23-24/07
Construction of temporary hogla structures for other govt. organizations, police staffs, new bus stand (k2), maintenance of mobile toilet unit, painting of m.s. fire fighting tank, special latrine at sagar mela ground in connection with g.s mela 2024
Read moreNiet-57/23-24/15
Temporary hogla structure, temporary special latrine at different places and maintenance of 100 nos. semi-permanent latrine of ganga sagar mela ground in connection with g.s. mela-2024 under kakdwip sub-division of alipore division, p.h.e dte.
Read moreNiet-57/23-24/04
Construction of temporary special latrine at different places of ganga sagar mela ground and operation and maintenance of temporary toilet in connection with g.s mela-2024 under kakdwip sub-division of alipore division, phe dte.
Read moreof your Industry type