Tender Details
Particulars | Details |
---|---|
Title |
Widening And Strengthening Of A. Duppalapally To Khajiramaram Via Kanakanalapally, Thanderpally And Nalgonda Nakrekal Pwd Road At Km 4/0 To Pajjuru Pwd Road At Km 1/0 Via Khajiramaram From Km 0/0 To 7/90 Of Nalgonda And Thipparthy Mandals In Nalgonda District ( Sub Work: Providing Consultancy Services For Conducting Topograhical Survey And Preparation Of Plan And Profile)
|
Description |
Widening And Strengthening Of A. Duppalapally To Khajiramaram Via Kanakanalapally, Thanderpally And Nalgonda Nakrekal Pwd Road At Km 4/0 To Pajjuru Pwd Road At Km 1/0 Via Khajiramaram From Km 0/0 To 7/90 Of Nalgonda And Thipparthy Mandals In Nalgonda District ( Sub Work: Providing Consultancy Services For Conducting Topograhical Survey And Preparation Of Plan And Profile)
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 591448 |
Reference Number |
04/ PA to EE/NLG/2025-26, Dt.23.04.2025 |
Tender Fee | 131 |
EMD | 9184 |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | April 28, 2025 21:00 |
End Date |
12/05/2025 ( Expired 26 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreConsultancy services for preparation of dpr and land acquisition of vasmat city bypass road on nh61 connecting to nh61 km 60.00 to km 75.400 in vasmat taluka district hingoli in the state of maharashtra on epc mode. tentative length 17.50 km
Consultancy services for preparation of dpr and land acquisition of vasmat city bypass road on nh61 connecting to nh61 km 60.00 to km 75.400 in vasmat taluka district hingoli in the state of maharashtra on epc mode. tentative length 17.50 km
Read moreConsultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Consultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreConsultancy services for details survey investigation and preparation of detailed project report including la and other clearance for construction of rob at km 17 goagachi of nh 131a in the state of bihar
Consultancy services for details survey investigation and preparation of detailed project report including la and other clearance for construction of rob at km 17 goagachi of nh 131a in the state of bihar
Read moreStrengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Strengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Read moreWidening and strengthening to yerrupalem -jamalapuram road from km 0/0 to 6/700 and jamalapuram -chandrugudem road from km 0/0 to 6/770 in khammam district. sub work:providing road safety interventions.
Widening and strengthening to yerrupalem -jamalapuram road from km 0/0 to 6/700 and jamalapuram -chandrugudem road from km 0/0 to 6/770 in khammam district. sub work:providing road safety interventions.
Read moreConsultancy services for preparation of detailed project report and detailed engineering for construction of second link road to jn port and construction of rob connecting jaskar and karal village at jn port
Consultancy services for preparation of detailed project report and detailed engineering for construction of second link road to jn port and
 construction of rob connecting jaskar and karal village at jn port 
Read moreWidening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Read morePeriodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Periodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Read moreof your Industry type