Tender Details

Particulars Details
Title
Cleaning The Debris Along Tb2 Belt Of Main Lncline From 17 Wl To 19 Wl Belt Conveyor At Shyamsundarpur Colliery
Description
Cleaning The Debris Along Tb2 Belt Of Main Lncline From 17 Wl To 19 Wl Belt Conveyor At Shyamsundarpur Colliery
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_302284_1
Reference
Number
ECL/GM/BA/E TENDER/23-24/Min/303 Dt 22.02.2024
Tender Fee 0
EMD 2300
Tender Value
Place Shyamsundarpur Colliery
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=313120
Start Date February 22, 2024 17:30
End Date

04/03/2024 ( Expired 479 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Appointment of issuing bank for a letter of credit

Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp

Read more
Construction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal

Construction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal

Read more
Manufacture testing supply and delivery of different type various clampconnectors and hardware fittings for works related to augmentation of 220kv main bus from twin acsr zebra to twin acsr moose conductor and allied works at kasba 220kv ss

Manufacture testing supply and delivery of different type various clampconnectors and hardware fittings for works related to augmentation of 220kv main bus from twin acsr zebra to twin acsr moose conductor and allied works at kasba 220kv ss

Read more
Shifting/di of existing utilities such as sewer line, water pipelines, storm /surface drain, etc. along the proposed delhi- gurugram- snb namo bharat corridor from dharuhera (govt. school) to snb (shahajahanpur - neemrana -behror)

Shifting/di of existing utilities such as sewer line, water pipelines, storm /surface drain, etc. along the proposed delhi- gurugram- snb namo bharat corridor from dharuhera (govt. school) to snb (shahajahanpur - neemrana -behror)

Read more
Cleaning, collection and transportation of spilled coal and coal dust from horizontal belt, big inclines belt, engine room and different chutes of gas plant to coal yard for unloading

Cleaning, collection and transportation of spilled coal and coal dust from horizontal belt, big inclines belt, engine room and different chutes of gas plant to coal yard for unloading

Read more
Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.

Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.

Read more
Construction of cc road and drain from samay gest house to purana galla mandi road and khilona machine to haweli ke piche thagan wali gali at ward no 09 tikamgarh

Construction of cc road and drain from samay gest house to purana galla mandi road and khilona machine to haweli ke piche thagan wali gali at ward no 09 tikamgarh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise