Tender Details

About Tender

🚂 Procurement Opportunity: Replacement Of Steel Girders With Psc Slab 🛠️ The Ministry Of Railways, Central Government, Invites Bids For The Proposed Replacement Of Existing Steel Girders With Psc Slab In Br No. 31 Down, 2x12.2 Meters, Within The Kzj Bpq Section At Secunderabad. 📄 🗓️ Bid Submission Deadline: April 03, 2024, 2:00 Pm A Tender Fee Of Inr 206,400 Is Applicable As Earnest Money Deposit (Emd). Interested Bidders Must Review The Complete Tender Documents For Detailed Specifications And Submission Guidelines. Keywords: Ministry Of Railways, Steel Girders, Psc Slab, Infrastructure, Civil Works, Government Tender, Earnest Money Deposit, Secunderabad
Particulars Details
Title
Proposed Replacement Of The Existing Steel Girders With Psc Slab Br No. 31 Down 2x12.2 M In Kzj Bpq Section
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 74055018
Reference
Number
09_N_SC_24_OT
Tender Fee 0
EMD 2.06 Lakh
Tender Value -
Place Secunderabad
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/042024/74055018/viewNitPdf_4506261.pdf

Start Date March 13, 2024 01:25
End Date
Expired 03/04/2024

Expired 927 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tvc division - proposed renewal of elastomeric bearings of psc girders.

Tvc division - proposed renewal of elastomeric bearings of psc girders.

Read more
Shoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast

Shoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast

Read more
Rebuilding of existing overaged steel girder bridges of 12.2m span by psc slab of br. no. 1145/1 up & dn (6x12.2m) in jhs-gwl section.

Rebuilding of existing overaged steel girder bridges of 12.2m span by psc slab of br. no. 1145/1 up & dn (6x12.2m) in jhs-gwl section.

Read more
Replacement of girder/slab/rail cluster with psc slab/rcc box of br. no. 124adn, 125dn, 139dn, 16dn, 30 & 196 in the jurisdiction of sr.den-iii/lko.

Replacement of girder/slab/rail cluster with psc slab/rcc box of br. no. 124adn, 125dn, 139dn, 16dn, 30 & 196 in the jurisdiction of sr.den-iii/lko.

Read more
Left over works of supply, fabrication and launching of girders (2x24.40 cg + 1x106.70m owg) of br. no.756, launching of psc slab (6x6.10m) and protection work of br. no. 750, drain between up and dn main line, km 170/0-173/0 and other ancillary works, in aza-kyq section in c/with nbq-glpt-kyq dl project

Left over works of supply, fabrication and launching of girders (2x24.40 cg + 1x106.70m owg) of br. no.756, launching of psc slab (6x6.10m) and protection work of br. no. 750, drain between up and dn main line, km 170/0-173/0 and other ancillary works, in aza-kyq section in c/with nbq-glpt-kyq dl project

Read more
Ohe modification work in connection with replacement of existing steel girder by precast psc slab under aden (an) jurisdiction (total 70 spans) in udhna-jalgaon section of mumbai division.

Ohe modification work in connection with replacement of existing steel girder by precast psc slab under aden (an) jurisdiction (total 70 spans) in udhna-jalgaon section of mumbai division.

Read more
Provision of s&t work in connection with rebuilding of existing overaged steel girder bridges of clear span 12.2m by psc slab of bridges in bina-dho section of jhansi division.

Provision of s&t work in connection with rebuilding of existing overaged steel girder bridges of clear span 12.2m by psc slab of bridges in bina-dho section of jhansi division.

Read more
Secunderabad division -bpq-kzj & magh-gdcr sections:-sw-i: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up,dn,ud & sl lines including station yard lines in sse/p.way/magh section sw-ii: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up,dn & ud lines including station yard lines in sse/p.way/skzr section sw-iii: proposed safety rel

Secunderabad division -bpq-kzj & magh-gdcr sections:-sw-i: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up,dn,ud & sl lines including station yard lines in sse/p.way/magh section sw-ii: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up,dn & ud lines including station yard lines in sse/p.way/skzr section sw-iii: proposed safety rel

Read more
Secunderabad division -bpq-kzj section-sw-i: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up,dn & ud lines including station yard lines in sse/p.way/mci section sw-ii: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up,dn & ud lines including station yard lines in sse/p.way/pdpl section sw-iii: proposed safety related track maintenance

Secunderabad division -bpq-kzj section-sw-i: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up,dn & ud lines including station yard lines in sse/p.way/mci section sw-ii: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up,dn & ud lines including station yard lines in sse/p.way/pdpl section sw-iii: proposed safety related track maintenance

Read more
Strengthening of substructure and replacement of existing fish bellied plate girders upto 12.20m span of major bridges br. no 736up (4x12.2m) at km:554/0-2,balance work of br no.750up (10x12.2m) at km:564/8-9, br no.792up (9x12.2m) at km:597/0-1, br no.823up (2x12.2m) at km:621/9-622/0, br.no.848up (2x12.2m) atkm:639/5-6 by post tensioned psc slabs, lifting/linking of track, supply of ballast, earthwork, blanketing work and other ancillary work as per 25t loading standard in the jurisdiction o

Strengthening of substructure and replacement of existing fish bellied plate girders upto 12.20m span of major bridges br. no 736up (4x12.2m) at km:554/0-2,balance work of br no.750up (10x12.2m) at km:564/8-9, br no.792up (9x12.2m) at km:597/0-1, br no.823up (2x12.2m) at km:621/9-622/0, br.no.848up (2x12.2m) atkm:639/5-6 by post tensioned psc slabs, lifting/linking of track, supply of ballast, earthwork, blanketing work and other ancillary work as per 25t loading standard in the jurisdiction o

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise