Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Unskilled Manpower A,Unskilled Manpower B,Unskilled Manpower C,Extra Hours Assistance D,Extra Hours
|
| Description |
|
| Organisation | NA | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/5383575 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | September 10, 2024 23:23 |
| End Date |
Expired
20/09/2024
Expired 752 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | EZHIL ENTERPRISES | - | 17-09-2024 13:46:29 | MSE | Qualified |
| 2 | LEO ASSOCIATES | - | 20-09-2024 16:27:52 | MSE | Qualified |
| 3 | S. SELVARAJAN & CO | - | 17-09-2024 16:20:10 | MSE | Qualified |
| 4 | SRI RUKMANI ELECTRICALS | - | 18-09-2024 18:38:42 | MSE | Qualified |
Expansion and extra floor of community hall near rajalingam garden, ward no.4(under sdf scheme) (6th recall)
Expansion and extra floor of community hall near rajalingam garden, ward no.4(under sdf scheme) (6th recall)
Read moreWater supply source improvement scheme for tandur kodangal municipalities with kagna river as source under tufidc assistance
Water supply source improvement scheme for tandur kodangal municipalities with kagna river as source under tufidc assistance
Read moreWater supply improvement scheme (phase-i) in nalgonda municipal corporation under tufidc assistance (amount of estimate : rs.8300.00 lakhs)
Water supply improvement scheme (phase-i) in nalgonda municipal corporation under tufidc assistance (amount of estimate : rs.8300.00 lakhs)
Read moreNarayankhed municipality laying of cc roads and cc drains along with construction of median along with street lights from mudiraj bhavan to basaweshwar chowk in narayankhed municipality under tufidc loan assistance
Narayankhed municipality laying of cc roads and cc drains along with construction of median along with street lights from mudiraj bhavan to basaweshwar chowk in narayankhed municipality under tufidc loan assistance
Read moreHiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Hiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Read moreFor hiring of outsource vehicle 01 no. 8/9 mt or equivalent including loading and unloading by 4 no unskilled workers for grid const.sub division,pstcl., jalandhar.
For hiring of outsource vehicle 01 no. 8/9 mt or equivalent including loading and unloading by 4 no unskilled workers for grid const. sub division, pstcl., jalandhar.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreHiring of 2.3 cu.m bucket capacity front end loader for re-handling of coal and sand at ktk-1 gr mines (ktk-1, 5 and 6), bhupalpalli area for a period of two years with 6000 working hours - reg.
Hiring of 2.3 cu.m bucket capacity front end loader for re-handling of coal and sand at ktk-1 gr mines (ktk-1, 5 and 6), bhupalpalli area for a period of two years with 6000 working hours - reg.
Read moreof your Industry type