Tender Details
Particulars | Details |
---|---|
Title |
Tape Insulation Cotton Self Adhseive 1 2,Tape Insulation Cotton Self Adhseive 1 2,Tape Insulating S
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id | GEM/2025/B/5954973 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | February 15, 2025 02:04 |
End Date |
07/03/2025 ( Expired 45 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Well hd x 4cp 15m, 20 in x13.3/8" x9.5/8* (edp-165103003),x-mas tree 2-9/16" x 2-1/16" -15m (edp-16
Read more
Hiring of model- 25/latest model of 1 no. omni bus/traveler (t-2), 25-1 seating capacity or equivalent sel vehicle for utilization period of bus up to 03 years or 2,50,000 kms for ae(tlm) sub dn., mpptcl, satna
Hiring of model- 25/latest model of 1 no. omni bus/traveler (t-2), 25-1 seating capacity or equivalent sel vehicle for utilization period of bus up to 03 years or 2,50,000 kms for ae(tlm) sub dn., mpptcl, satna
Read moreInternal improvement works of (package-21) for water supply scheme 1. pucca chisti 2. churiwala chisti 3. khan wala , block fazilka, distt. fazilka (under nabard xxvii/jjm)
Internal improvement works of (package-21) for water supply scheme 1. pucca chisti 2. churiwala chisti 3. khan wala , block fazilka, distt. fazilka (under nabard xxvii/jjm)
Read moreBiennial maintenance of ash slurry line extension at different dp and dp changeover (both phase #1 and phase # 2) inside ash pond of sgtpp
Biennial maintenance of ash slurry line extension at different dp and dp changeover (both phase #1 and phase #2) inside ash pond of sgtpp.
Read moreShort term maintenance contracts from km 0/0-1/6, km1/6-2/6, km 4/6-6/6, km 11/6-12/6 of nh 381a vellakovil - sankagiri road in the state of tamil nadu for the year 2024-25
Short term maintenance contracts from km 0/0-1/6, km1/6-2/6, km 4/6-6/6, km 11/6-12/6 of nh 381a vellakovil - sankagiri road in the state of tamil nadu for the year 2024-25
Read moreMachinery spares 1,machinery spares 2,machinery spares 3,machinery spares 4,machinery spares 5,mach
Read more
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Read moreLed light type 1,led light type 2,led light type 3,led light type 4,led light driver type 1,led lig
Read more
Kmda/w and s/gap/se (gap)/niq-01(r)/24-25 (sl.-2)
Preparation of detailed project report (dpr) for pollution abatement sewerage project interception and di with stp) at english bazar municipal town in west bengal (2nd call).
Read moreof your Industry type