Tender Details

Particulars Details
Title
Ttps Mech Ii Bm Unt V Reconditioning Of Coal Nozzle And Matching With Coal Nozzle Tips Released From Unit V Boiler During 2025 2026 Overhaul
Description
Ttps Mech Ii Bm Unt V Reconditioning Of Coal Nozzle And Matching With Coal Nozzle Tips Released From Unit V Boiler During 2025 2026 Overhaul
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_533109_1
Reference
Number
CE/TTPS/SE/M-II/No.79/2025-26
Tender Fee 0
EMD 4400
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=634574
Start Date March 17, 2025 23:30
End Date

03/04/2025 ( Expired 86 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Mtc. of road from ranirbazar motorstand to durganagar (upto durganagar school) under jirania sub- division pwd (r and b)(l 1.40 km) during the year 2025-2026 sh grouting, re-carpetting, seal coat, etc. (l 0.60 km, from ch.0.00 mtr to ch.600.00

Mtc. of road from ranirbazar motorstand to durganagar (upto durganagar school) under jirania sub- division pwd (r and b)(l 1.40 km) during the year 2025-2026 sh grouting, re-carpetting, seal coat, etc. (l 0.60 km, from ch.0.00 mtr to ch.600.00

Read more
Supply of 28 inch coal nozzle and with model of v01 v02 v03 and fuel oil gun removable part jx assembly with spray and mixing plates of hfo and ldo oil guns for 600mw boiler

Supply of 28 inch coal nozzle and with model of v01 v02 v03 and fuel oil gun removable part jx assembly with spray and mixing plates of hfo and ldo oil guns for 600mw boiler

Read more
Mtps i bm unit i removal of deteriorated and dislodged insulation and re insulation with new insulation materials on the top and bottom portion of fg duct from mill bay outlet to esp inlet and other related works

Mtps i bm unit i removal of deteriorated and dislodged insulation and re insulation with new insulation materials on the top and bottom portion of fg duct from mill bay outlet to esp inlet and other related works

Read more
Extension of under ground sewerage line from in front of office and store room to connect with existing sewerage line of subhas sarabor state swimming academy during 2025 26

Extension of under ground sewerage line from in front of office and store room to connect with existing sewerage line of subhas sarabor state swimming academy during 2025 26

Read more
Emergent repairing work of different roads in patches by pre coating stone aggregates, wbm and bm under gazole highway section under gazole highway sub-division under malda highway division in the district of malda during the year 2025 -2026

Emergent repairing work of different roads in patches by pre coating stone aggregates, wbm and bm under gazole highway section under gazole highway sub-division under malda highway division in the district of malda during the year 2025 -2026

Read more
Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash

Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash

Read more
Ttps operation circle mpm ii unit iv and v reconditioning of the worn out journal head assembly released from unit iv and v hp 803 mills and assembling with pillow blocks

Ttps operation circle mpm ii unit iv and v reconditioning of the worn out journal head assembly released from unit iv and v hp 803 mills and assembling with pillow blocks

Read more
Ttps operation circle cad reconditioning of 1600mm dia butterfly valves in condenser cooling water inlet and outlet pipe lines in east side and west side of unit iv and v

Ttps operation circle cad reconditioning of 1600mm dia butterfly valves in condenser cooling water inlet and outlet pipe lines in east side and west side of unit iv and v

Read more
Post retrofitting evaluation of load capacity and dynamic behavior of structural elements of vybk stadium by load test along with vibration and deflection measurement during running match with full spectator capacity during the year 2025-2026

Post retrofitting evaluation of load capacity and dynamic behavior of structural elements of vybk stadium by load test along with vibration and deflection measurement during running match with full spectator capacity during the year 2025-2026

Read more
Service contract for refractory and insulation work de insulation and re insulation with sheet cladding work of different portion of boiler area different ducts pipe lines and valves etc under bmii dept during unit 3 overhauling at sgtpp

Service contract for refractory and insulation work de insulation and re insulation with sheet cladding work of different portion of boiler area different ducts pipe lines and valves etc under bmii dept during unit 3 overhauling at sgtpp&amp#x0d &amp#x0d &amp#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise