Tender Details
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Bm Full Reconditioning Of Worn Out Coal Nozzle Tips Released From Unit V Boiler During 2025 2026 Overhaul
|
Description |
Ttps Mech Ii Bm Full Reconditioning Of Worn Out Coal Nozzle Tips Released From Unit V Boiler During 2025 2026 Overhaul
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_533104_1 |
Reference Number |
CE/TTPS/SE/M-II/No.78/2025-26 |
Tender Fee | 0 |
EMD | 7100 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=634569 |
Start Date | March 17, 2025 23:30 |
End Date |
03/04/2025 ( Expired 38 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i bm unit i boiler pressure parts aoh 2025 cleaning of boiler structures from 0 to 52 m level etc
Mtps i bm unit i boiler pressure parts aoh 2025 cleaning of boiler structures from 0 to 52 m level etc
Read moreProviding skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-ix of the ktps-v stage during the annual overhaul period.
Providing skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-ix of the ktps-v stage during the annual overhaul period.
Read moreMtps i bm unit i boiler pressure parts aoh 2025 maintenance of burners and replacement of worn out fasteners at cover plates
Mtps i bm unit i boiler pressure parts aoh 2025 maintenance of burners and replacement of worn out fasteners at cover plates
Read moreKtps-v-cam-laying of fire crete cement to the bottom ash hoppers, fabrication and replacement of refractory cooling water headers and laying of 200nb ci pipes of bottom ash handling system for unit-9 during the overhaul 2025-2026-reg.
Ktps-v-cam-laying of fire crete cement to the bottom ash hoppers, fabrication and replacement of refractory cooling water headers and laying of 200nb ci pipes of bottom ash handling system for unit-9 during the overhaul 2025-2026-reg.
Read moreMtps i mi ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2025 2026 of unit i
Mtps i mi ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2025 2026 of unit i
Read morePatch welding to be done for rectification of damaged flue gas duct from aph-b hopper to chimeny along the path cd side flue gas duct and its honeycomb structure ( cd) after dismantling the damaged / worn out portion of flue gas ducts for overhaul of unit ix
Patch welding to be done for rectification of damaged flue gas duct from aph b hopper to chimeny along the path cd side flue gas duct and its honeycomb structure c and d after dismantling the damaged worn out portion of flue gas ducts for overhaul of unit ix
Read morePatch welding to be done for rectification of damaged flue gas duct from aph-a hopper to chimeny along the path ab side flue gas duct and its honeycomb structure ( ab) after dismantling the damaged / worn out portion of flue gas ducts for overhaul of unit ix
Patch welding to be done for rectification of damaged flue gas duct from aph a hopper to chimeny along the path ab side flue gas duct and its honeycomb structure ( a and b) after dismantling the damaged worn out portion of flue gas ducts for overhaul of unit ix
Read moreEmandmrt- annual maintenance contract of 1768kgs ncl (numeric control logic) controller unit-ix boiler lift at ktps-v stage for the period from 01-07-2025 to 31-03-2026.
Emandmrt- annual maintenance contract of 1768kgs ncl (numeric control logic) controller unit-ix boiler lift at ktps-v stage for the period from 01-07-2025 to 31-03-2026.
Read moreEmandmrt- inspection of hydrogen sealing assembly system (seal and seal rings) inner oil catchers generator and exciter bearings no 5, 6 and 7 and hydrogen and exciter coolers of 250 mw unit 9 of ktps-v stage during annual overhaul period 2025-26.
Emandmrt- inspection of hydrogen sealing assembly system (seal and seal rings) inner oil catchers generator and exciter bearings no 5, 6 and 7 and hydrogen and exciter coolers of 250 mw unit 9 of ktps-v stage during annual overhaul period 2025-26.
Read moreOverhauling of flue gas damper assembly of aph inlet/primary air/secondary air, servicing of esp inlet gate, reclamation/repairing of worn-out coal nozzle, replacement/repairing of bends in boiler during the capital overhauling of unit6 of 2x250mw
Overhauling of flue gas damper assembly of aph &#x0d inlet/primary/secondary air, servicing of esp inlet &#x0d gate, reclamation/repairing of worn-out coal nozzle, replacement/repairing of bends in boiler during the &#x0d capital overhauling of unit6 of 2x250mw
Read moreof your Industry type