Tender Details
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Bm Full Reconditioning Of Worn Out Coal Nozzle Tips Released From Unit Iv Boiler During 2025 2026 Overhaul
|
Description |
Ttps Mech Ii Bm Full Reconditioning Of Worn Out Coal Nozzle Tips Released From Unit Iv Boiler During 2025 2026 Overhaul
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_524631_1 |
Reference Number |
CE/TTPS/SE/M-II/No.03/2025-26 |
Tender Fee | 0 |
EMD | 10100 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=624560 |
Start Date | February 13, 2025 23:30 |
End Date |
01/03/2025 ( Expired 97 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreNctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreMtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Mtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Read moreMtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Mtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Read moreTtps mech ii bm unit iii strengthening of weak welding joints of step grills platform grills and renewal of damaged corroded structurals from 0 mtr to 52 mtr elevation of unit iii boiler
Ttps mech ii bm unit iii strengthening of weak welding joints of step grills platform grills and renewal of damaged corroded structurals from 0 mtr to 52 mtr elevation of unit iii boiler
Read moreTtps mech ii bm unit iii replacement of wornout corroded structural supports painting of structurals removal of existing wornout asbestos sheets and providing new galvalume sheets in all four sides in unit iii boiler at 56mtr elevation
Ttps mech ii bm unit iii replacement of wornout corroded structural supports painting of structurals removal of existing wornout asbestos sheets and providing new galvalume sheets in all four sides in unit iii boiler at 56mtr elevation
Read moreTtps mech ii bm unit iv v overhauling of igv assembly for unit iv v fd fans model an18e6
Ttps mech ii bm unit iv v overhauling of igv assembly for unit iv v fd fans model an18e6
Read moreMtps i bm unit i boiler pressure parts aoh 2025 rectification of buck stay beam and supports renewal of wornout buck stay pin fabrication of buck stay cover plate etc in ist and ii nd pass area and allied works
Mtps i bm unit i boiler pressure parts aoh 2025 rectification of buck stay beam and supports renewal of wornout buck stay pin fabrication of buck stay cover plate etc in ist and ii nd pass area and allied works
Read moreComprehensive maintenance of various roads under pwd division south road-ii during 2025-26 and 2026-27. (sh_ thermoplastic and synthetic enamel paint work under sub-division-i and iv.)
Comprehensive maintenance of various roads under pwd division south road-ii during 2025-26 and 2026-27. (sh_ thermoplastic and synthetic enamel paint work under sub-division-i and iv.)
Read moreConstruction of cement concrete road from h/o debu saha to h/onaresh biswas at sansad iv (jagadanandapur) activity id 109850188 aap no -75(2025-2026) under bethuadahari ii g.p.
Construction of cement concrete road from h/o debu saha to h/onaresh biswas at sansad iv (jagadanandapur) activity id 109850188 aap no -75(2025-2026) under bethuadahari ii g.p.
Read moreof your Industry type