Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Slab Culvert At Road Side Canal For Connecting 2nd Tube Well Site At Badalpur Pwss
|
| Description |
Construction Of Slab Culvert At Road Side Canal For Connecting 2nd Tube Well Site At Badalpur Pwss Within Ramnagar Ii Block Under Digha Sub Division Of Tamluk Division,Phed , Purba Medinipur.
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2024_PHED_768674_3 |
|
Reference Number |
AE/DSD/NIeT_07/2024-2025 |
| Tender Fee | 0 |
| EMD | 5766 |
| Tender Value | - |
| Place | Badalpur PWSS |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1702035 |
| Start Date | November 18, 2024 20:30 |
| End Date |
Expired
22/11/2024
Expired 693 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 2 x 4 x 4 meter span box culvert along with approach roads and protective works to replace the damaged minor bridge at the 2nd kilometer of the belahi-udhopur village connecting road in district deoria
Construction of 2 x 4 x 4 meter span box culvert along with approach roads and protective works to replace the damaged minor bridge at the 2nd kilometer of the belahi-udhopur village connecting road in district deoria
Read moreRepair maintaince of chain link fencing, drain, path, culvert, compound wall, steel gate, hardstading, cover slab incl cleaning of septic tank, soak well sewage line, manholes cover, misc works of unrestected and restricted area of cod under ge (e)
Repair maintaince of chain link fencing, drain, path, culvert, compound wall, steel gate, hardstading, cover slab incl cleaning of septic tank, soak well sewage line, manholes cover, misc works of unrestected and restricted area of cod under ge (e)
Read moreConstruction work of a new tube well with 225 mm bore size and 200 feet depth at katpula jalakal sansthan, along with laying and connecting the distribution line, for strengthening and ensuring smooth operation of drinking water supply in the city
Construction work of a new tube well with 225 mm bore size and 200 feet depth at katpula jalakal sansthan, along with laying and connecting the distribution line, for strengthening and ensuring smooth operation of drinking water supply in the city
Read moreDrilling of 175/150 mm dia tube well and installation of submersible motor pump set including electrification work/ installation complete at ward no. 29, banti sharma wali gali. file no. 160/25x9/1. 2nd call
Drilling of 175/150 mm dia tube well and installation of submersible motor pump set including electrification work/ installation complete at ward no. 29, banti sharma wali gali. file no. 160/25x9/1. 2nd call
Read moreConstruction work of a new tube well with 225 mm bore size and 200 feet depth at gopal nagar jalakal sansthan, along with laying and connecting the distribution line, for strengthening and ensuring smooth operation of drinking water supply in the cit
Construction work of a new tube well with 225 mm bore size and 200 feet depth at gopal nagar jalakal sansthan, along with laying and connecting the distribution line, for strengthening and ensuring smooth operation of drinking water supply in the cit
Read moreConstruction work of a new tube well of 225 mm bore size and 200 feet depth at gopal bagh jal kal sansthan, along with laying and connecting the distribution line, to strengthen and streamline the operation of drinking water supply in the city under
Construction work of a new tube well of 225 mm bore size and 200 feet depth at gopal bagh jal kal sansthan, along with laying and connecting the distribution line, to strengthen and streamline the operation of drinking water supply in the city under
Read moreConstruction cc road behind bank of baroda at w no 15, construction drain at old uppalli bekary to imran house w no 16, construction of culvert at infront of lakshman house w no 17, construction of drain at 2nd cross shek farid house to munna house wno 19, construction drain at bandi mut road shabina house to ahmed house w no 20, construction of drian at infront of royal shamiyana and construction of covering slab at sheriff galli w no 22 cmc ckm limits
Construction cc road behind bank of baroda at w no 15, construction drain at old uppalli bekary to imran house w no 16, construction of culvert at infront of lakshman house w no 17, construction of drain at 2nd cross shek farid house to munna house wno 19, construction drain at bandi mut road shabina house to ahmed house w no 20, construction of drian at infront of royal shamiyana and construction of covering slab at sheriff galli w no 22 cmc ckm limits
Read moreRepair and renovation of 1st tube well site of jamdoba godamouli pwss.
Repair and renovation of 1st tube well site of jamdoba godamouli pwss.
Read moreof your Industry type