Tender Details

Particulars Details
Title
Construction Of Slab Culvert At Road Side Canal For Connecting 2nd Tube Well Site At Badalpur Pwss
Description
Construction Of Slab Culvert At Road Side Canal For Connecting 2nd Tube Well Site At Badalpur Pwss Within Ramnagar Ii Block Under Digha Sub Division Of Tamluk Division,Phed , Purba Medinipur.
Organisation PHE | State Govt. and UT
Tender Id 2024_PHED_768674_3
Reference
Number
AE/DSD/NIeT_07/2024-2025
Tender Fee 0
EMD 5766
Tender Value -
Place Badalpur PWSS
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1702035

Start Date November 18, 2024 20:30
End Date
Expired 22/11/2024

Expired 693 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Big dia tube well 2 under peruabad pwss

Big dia tube well 2 under peruabad pwss

Read more
Big dia tube well 1 under peruabad pwss

Big dia tube well 1 under peruabad pwss

Read more
Construction of 2 x 4 x 4 meter span box culvert along with approach roads and protective works to replace the damaged minor bridge at the 2nd kilometer of the belahi-udhopur village connecting road in district deoria

Construction of 2 x 4 x 4 meter span box culvert along with approach roads and protective works to replace the damaged minor bridge at the 2nd kilometer of the belahi-udhopur village connecting road in district deoria

Read more
Repair maintaince of chain link fencing, drain, path, culvert, compound wall, steel gate, hardstading, cover slab incl cleaning of septic tank, soak well sewage line, manholes cover, misc works of unrestected and restricted area of cod under ge (e)

Repair maintaince of chain link fencing, drain, path, culvert, compound wall, steel gate, hardstading, cover slab incl cleaning of septic tank, soak well sewage line, manholes cover, misc works of unrestected and restricted area of cod under ge (e)

Read more
Construction work of a new tube well with 225 mm bore size and 200 feet depth at katpula jalakal sansthan, along with laying and connecting the distribution line, for strengthening and ensuring smooth operation of drinking water supply in the city

Construction work of a new tube well with 225 mm bore size and 200 feet depth at katpula jalakal sansthan, along with laying and connecting the distribution line, for strengthening and ensuring smooth operation of drinking water supply in the city

Read more
Drilling of 175/150 mm dia tube well and installation of submersible motor pump set including electrification work/ installation complete at ward no. 29, banti sharma wali gali. file no. 160/25x9/1. 2nd call

Drilling of 175/150 mm dia tube well and installation of submersible motor pump set including electrification work/ installation complete at ward no. 29, banti sharma wali gali. file no. 160/25x9/1. 2nd call

Read more
Construction work of a new tube well with 225 mm bore size and 200 feet depth at gopal nagar jalakal sansthan, along with laying and connecting the distribution line, for strengthening and ensuring smooth operation of drinking water supply in the cit

Construction work of a new tube well with 225 mm bore size and 200 feet depth at gopal nagar jalakal sansthan, along with laying and connecting the distribution line, for strengthening and ensuring smooth operation of drinking water supply in the cit

Read more
Construction work of a new tube well of 225 mm bore size and 200 feet depth at gopal bagh jal kal sansthan, along with laying and connecting the distribution line, to strengthen and streamline the operation of drinking water supply in the city under

Construction work of a new tube well of 225 mm bore size and 200 feet depth at gopal bagh jal kal sansthan, along with laying and connecting the distribution line, to strengthen and streamline the operation of drinking water supply in the city under

Read more
Construction cc road behind bank of baroda at w no 15, construction drain at old uppalli bekary to imran house w no 16, construction of culvert at infront of lakshman house w no 17, construction of drain at 2nd cross shek farid house to munna house wno 19, construction drain at bandi mut road shabina house to ahmed house w no 20, construction of drian at infront of royal shamiyana and construction of covering slab at sheriff galli w no 22 cmc ckm limits

Construction cc road behind bank of baroda at w no 15, construction drain at old uppalli bekary to imran house w no 16, construction of culvert at infront of lakshman house w no 17, construction of drain at 2nd cross shek farid house to munna house wno 19, construction drain at bandi mut road shabina house to ahmed house w no 20, construction of drian at infront of royal shamiyana and construction of covering slab at sheriff galli w no 22 cmc ckm limits

Read more
Repair and renovation of 1st tube well site of jamdoba godamouli pwss.

Repair and renovation of 1st tube well site of jamdoba godamouli pwss.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise