Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting Of Pulley Of Sy Seven Level Endless Haulage Of Lhcm 2 Section Six Times From Twenty Four Dip To Twelve Dip
|
| Description |
Shifting Of Pulley Of Sy Seven Level Endless Haulage Of Lhcm 2 Section Six Times From Twenty Four Dip To Twelve Dip
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_318712_1 |
|
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/78 dated 03.10.2024 |
| Tender Fee | 0 |
| EMD | 4900 |
| Tender Value | |
| Place | JHANJRA UNDERGROUND |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330331 |
| Start Date | October 08, 2024 16:30 |
| End Date |
Expired
18/10/2024
Expired 625 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Engagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Engagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreComplete repairing of endless haulage pulley-2 nos. in longwall section required for salvaging of equipment.sl.no. haulage pulley 2 and 3
Complete repairing of 
 endless haulage pulley-2 
 nos. in longwall section 
 required for salvaging of 
 equipment.sl.no. haulage 
 pulley 2 and 3
Read moreTransportation-installation of one endless haulage complete with eight times return pulley shifting and transportation-fittings of 1260mtr track line at panel-8 of r-vii seam at 3n4 incline
Transportation-installation of one endless haulage complete with eight times return pulley shifting and transportation-fittings of 1260mtr track line at panel-8 of r-vii seam at 3n4 incline
Read moreComplete repairing of endless haulage pulley in longwall section required for salvaging of equipments, sl.no. eh-1
Complete repairing of 
 endless haulage pulley in 
 longwall section required 
 for salvaging of equipments, 
 sl.no. eh-1
Read moreConstruction of 24(twenty four) nos. brick pillars along the haulage roadway from 20 dip off 48l to 36 dip off 55l of hijuli r-viii seam at dubeswari colliery
Construction of 24(twenty four) nos. brick pillars along the haulage roadway from 20 dip off 48l to 36 dip off 55l of hijuli r-viii seam at dubeswari colliery
Read moreTransporting of endless haulage shifting from 13r 49l to 36d 30l at bc 3 4 pits
Transporting of endless haulage shifting from 13r 49l to 36d 30l at bc 3 4 pits
Read moreTransporation-installation of one endless haulage complete with five times return pulley installation and transportation-fitting of 828mtr track line at panel-7 of r-vii seam at 3n4 incline
Transporation-installation of one endless haulage complete with five times return pulley installation and transportation-fitting of 828mtr track line at panel-7 of r-vii seam at 3n4 incline
Read moreCarrying, transporting and re fabrication with fitting of new 19 mm 2000 meter haulage rope with shifting of pulley of 75hp endless haulage 2ed at pit no 02 at sspur colliery under bankola area
Carrying, transporting and re fabrication with fitting of new 19 mm 2000 meter haulage rope with shifting of pulley of 75hp endless haulage 2ed at pit no 02 at sspur colliery under bankola area
Read moreLaying of haulage track at 12 west level after dismantle from 11 east dip development section of sripur seam of bhanora west block colliery.
Laying of haulage track at 12 west level after dismantle from 11 east dip development section of sripur seam of bhanora west block colliery.
Read moreof your Industry type