Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Complete Repairing Of Endless Haulage Pulley 2 Nos. In Longwall Section Required For Salvaging Of Equipment.Sl.No. Haulage Pulley 2 And 3
|
| Description |
Complete Repairing Of 
Endless Haulage Pulley 2 
Nos. In Longwall Section 
Required For Salvaging Of 
Equipment.Sl.No. Haulage 
Pulley 2 And 3
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2025_BCCL_347583_1 |
|
Reference Number |
BCCL/WJA/AM(ENM)/25-26/RP-88 |
| Tender Fee | 0 |
| EMD | 1000 |
| Tender Value | - |
| Place | Mppnidih Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=360288 |
| Start Date | November 19, 2025 14:30 |
| End Date |
Expired
03/12/2025
Expired 312 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of new mahindra bolero pik-up 1.5 fitted with bathla vehicle-mounted telescopic ladder, complete with winch, pulley, self-locking mechanism, mounting arrangement, rto registration, road tax and insurance.
Supply of new mahindra bolero pik-up 1.5 fitted with bathla vehicle-mounted telescopic ladder, complete with winch, pulley, self-locking mechanism, mounting arrangement, rto registration, road tax and insurance.
Read moreProcurement of paints are required for painting of sign boards,sop,curb walls ,tyre cage,bay margins etc. at different section at base workshop oc-iii, rg2
Procurement of paints are required for painting of sign boards,sop,curb walls ,tyre cage,bay margins etc. at different section at base workshop oc-iii, rg2
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreManufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khaira
Manufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khairatabad zone (o and m division no.16).
Read moreManufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khaira
Manufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khairatabad zone (o and m division no.16).
Read moreComplete repairing of endless haulage pulley in longwall section required for salvaging of equipments, sl.no. eh-1
Complete repairing of 
 endless haulage pulley in 
 longwall section required 
 for salvaging of equipments, 
 sl.no. eh-1
Read moreTransportation-installation of one endless haulage complete at lhcm1 section of r-viia seam at 3n4 incline, jpc
Transportation-installation of one endless haulage complete at lhcm1 section of r-viia seam at 3n4 incline, jpc
Read moreShifting of pulley of sy-seven level endless haulage of lhcm-2 section six times from twenty-four dip to twelve dip
Shifting of pulley of sy-seven level endless haulage of lhcm-2 section six times from twenty-four dip to twelve dip
Read moreof your Industry type