Tender Details

Particulars Details
Title
M/O Green Belt And Rsp Along With Express Highways 15.00 To 20.00 Km Rhs Service Road , 02 Year Maintenance
Description
M/O Green Belt And Rsp Along With Express Highways 15.00 To 20.00 Km Rhs Service Road , 02 Year Maintenance
Organisation New Okla Industrial Development Authority | State Govt. and UT
Tender Id 2024_NOIDA_937660_1
Reference
Number
03/D(H)/DD(H)-III/2024-25
Tender Fee 2832
EMD 1.99 Lakh
Tender Value
Place NOIDA
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1835553
Start Date March 17, 2025 16:00
End Date

24/03/2025 ( Expired 50 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Maintenance work of jabalpur bhopal section of nh-12 from bareli to goharganj (bineka village) km. 193.000 to km. 255.300 to four lane with paved shoulder with provision of rigid pavement on epc mode under nhdp-iii (package iv) on the risk and cost o

Maintenance work of jabalpur bhopal section of nh-12 from bareli to goharganj (bineka village) km. 193.000 to km. 255.300 to four lane with paved shoulder with provision of rigid pavement on epc mode under nhdp-iii (package iv) on the risk and cost o

Read more
Maintenance of road from amtali bazar to senpara (l 2.500 km) under the jurisdiction of pwd (r and b) khayerpur sub division during the year 2025-26 (group - ii)

Maintenance of road from amtali bazar to senpara (l 2.500 km) under the jurisdiction of pwd (r and b) khayerpur sub division during the year 2025-26 (group - ii)

Read more
Maintenance of road from amtali bazar to senpara (l 2.500 km) under the jurisdiction of pwd (r and b) khayerpur sub division uring the year 2025-26 (group - i)

Maintenance of road from amtali bazar to senpara (l 2.500 km) under the jurisdiction of pwd (r and b) khayerpur sub division uring the year 2025-26 (group - i)

Read more
Protection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.

Protection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.

Read more
Providing and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector between km 15.00 to km 42.00 at different stretches on road pithoragarh-tawaghat and tack coat with bitumen emulsion over existing surface, correction work w

Providing and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector between km 15.00 to km 42.00 at different stretches on road pithoragarh-tawaghat and tack coat with bitumen emulsion over existing surface, correction work w

Read more
Setting up of 50 tpd solid waste processing facilities including wet waste processing facility dry waste processing facility and sanitary landfill for processing inerts along with o and m of the facility for the duration of 7 plus 4 subject to rev

Setting up of 50 tpd solid waste processing facilities including wet waste processing facility dry waste processing facility and sanitary landfill for processing inerts along with o and m of the facility for the duration of 7 plus 4 subject to rev

Read more
Upgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made

Upgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise