Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Return Roller With Assembly And Troughing Roller For Chp Iii, Ptps, Panipat.
|
| Description |
Supply Of Return Roller With Assembly And Troughing Roller For Chp Iii, Ptps, Panipat.
|
| Organisation | Haryana Board Corporation | State Govt. and UT |
| Tender Id | 2024_HBC_401310_1 |
|
Reference Number |
POM-200880 |
| Tender Fee | 2360 |
| EMD | 1.25 Lakh |
| Tender Value | |
| Place | PTPS Panipat |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=477700 |
| Start Date | August 17, 2024 00:10 |
| End Date |
Expired
18/09/2024
Expired 648 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hydrazine hydrate hydrated lime to rgtpp khedar hisar and ptps panipat
Hydrazine hydrate hydrated lime to rgtpp khedar hisar and ptps panipat
Read moreSupply of kcp mill top and bottom roller bearings and binny mill bottom roller bearing
Supply of kcp mill top and bottom roller bearings and binny mill bottom roller bearing
Read moreSupply of 18 ghz rf cable assembly with n-male at both sides
Supply of 18 ghz rf cable assembly with n-male at both sides
Read moreSupply, installation, testing and commissioning of lifting tackle complete assembly of 25/5 ton capacity
For complete deion and other details, please refer to tender
Read moreProcurement of flender make conveyor gearbox for chp ntpc farakka.
Procurement of flender make conveyor gearbox for chp ntpc farakka.
Read moreSupply of terminal studs with housing assembly of 420kv, 3150a, siemens make hcb isolator installed at csctpp 400kv switchyard, chhabra
Supply of terminal studs with housing assembly of 420kv, 3150a, siemens make hcb isolator installed at csctpp 400kv switchyard, chhabra
Read moreSupply of laptop with complete installation and setup for kera
Supply of laptop with complete installation and setup for kera
Read moreFireproofing works on structures and equipments in connection with composite work for avu unit (part-a) for panipat refinery expansion project (p25) of m/s. indian oil corporation limited
Fireproofing works on structures and equipments in connection with composite work for avu unit (part-a) for panipat refinery expansion project (p25) of m/s. indian oil corporation limited
Read moreRepairing of stick assembly and lhs final drive assembly along with its foundation of ck300 shovel sl. no. 737 deployed at topa ocp, kuju area.
Repairing of stick assembly and lhs final drive assembly along with its foundation of ck300 shovel sl. no. 737 deployed at topa ocp, kuju area.
Read moreof your Industry type