Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design, Supply, Erection, Testing, And Commissioning Of 30 Mva, 45 Mva Spare Power Transformers And Carry Out Ancillary Allied Works At Tembhu Lift Irrigation Scheme Stage 1 A And 1 B.
|
| Description |
Design, Supply, Erection, Testing, And Commissioning Of 30 Mva, 45 Mva Spare Power Transformers And Carry Out Ancillary Allied Works At Tembhu Lift Irrigation Scheme Stage 1 A And 1 B.
|
| Organisation | CE (Electrical) Hydro Electric Projects Mumbai | State Govt. and UT |
| Tender Id | 2025_MHEPM_1161526_1 |
|
Reference Number |
13/2024-2025 (Sr.No.1) |
| Tender Fee | 6400 |
| EMD | 8.72 Lakh |
| Tender Value | |
| Place | Tembhu Tal Karad Dist Satara |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2019891 |
| Start Date | March 17, 2025 16:00 |
| End Date |
Expired
01/04/2025
Expired 430 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply erection testing and commissioning of auxuliary transformer 33kv 0.433kv 250kva for supply of power at md office complex at janipur along with allied works
Supply erection testing and commissioning of auxuliary transformer 33kv by 0.433kv 250kva for supply of power at md office complex at janipur along with allied works
Read moreDesign, engineering, testing, commissioning, erection, supply and installation of 1 no. 132 kv double ckt. d plus 6 type tower in chatha canal section line out to facilitate power flow in second ckt of 132 kv double ckt. miran sahib canal
Design, engineering, testing, commissioning, erection, supply and installation of 1 no. 132 kv double ckt. d plus 6 type tower in chatha canal section line out to facilitate power flow in second ckt of 132 kv double ckt. miran sahib canal
Read moreSurvey design fabrication supply installation testing and commissioning of total 12.60 kw of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 05 years
Survey design fabrication supply installation testing and commissioning of total 12.60 kw of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 05 years at krushibeej farmer producer company ltt
Read moreSupply erection testing and commissioning of 30 mva 45 mva and 3.15 mva spare power transformers and carry out ancillary allied works at tembhu lift irrigation scheme stage 1a 1b and 2
Supply erection testing and commissioning of 30 mva 45 mva and 3.15 mva spare power transformers and carry out ancillary allied works at tembhu lift irrigation scheme stage 1a 1b and 2
Read moreTlip repairs maintenance operation and supplying manpower and ancillary work of electrical mechanical and civil part at tembhu pumphouse stgae 1a 1b stage 2 3 4 and 5 visapur lift irrigation scheme stage 1a 1b 2 and 3 pundi lift irrigation stage 1a
Tlip repairs maintenance operation and supplying manpower and ancillary work of electrical mechanical and civil part at tembhu pumphouse stgae 1a 1b stage 2 3 4 and 5 visapur lift irrigation scheme stage 1a 1b 2 and 3 pundi lift irrigation stage 1a
Read moreSupply erection testing commissioning of 33 kv transmission line from tembhu lift irrigation scheme stage 3 to 4
Supply erection testing commissioning of 33 kv transmission line from tembhu lift irrigation scheme stage 3 to 4
Read moreDesign, supply, erection, testing, commissioning of 25 mva power transformer at tembhu lis stage 3, mahuli. 4 mva transformer and 33 kv bay at stage 4 vejegaon, tal.khanapur, dist.sangli
Design, supply, erection, testing, commissioning of 25 mva power transformer at tembhu lis stage 3, mahuli. 4 mva transformer and 33 kv bay at stage 4 vejegaon, tal.khanapur, dist.sangli
Read moreSupply erection testing and commissioning of 33/6.6 kv 6.3 mva power transformer at janai lift irrigation scheme stage-ii tal. daund dist. pune .
Supply erection testing and commissioning of 33/6.6 kv 6.3 mva power transformer at janai lift irrigation scheme stage-ii tal. daund dist. pune .
Read moreServicing of 220 kv circuit breaker, spreading the required quantity of gravel in switchyard and to carry out other maintenance works at tembhu lift irrigation scheme stage 1a to 5.
Servicing of 220 kv circuit breaker, spreading the required quantity of gravel in switchyard and to carry out other maintenance works at tembhu lift irrigation scheme stage 1a to 5.
Read moreTo carry out emergency works for switchyard and transmission line of tembhu lift irrigation scheme stage 1 a to 5 and to carry out gravel spreading work in the switchyard of tembhu lis stage 3, 4 and 5.
To carry out emergency works for switchyard and transmission line of tembhu lift irrigation scheme stage 1 a to 5 and to carry out gravel spreading work in the switchyard of tembhu lis stage 3, 4 and 5.
Read moreof your Industry type