Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Btps Tggenco
|
| Description |
Btps Chp Replacement Of Damaged Scoop Coupling With Reconditioned Spare Scoop Coupling, Oil Filter Cleaning, Cooler Cleaning, Replacement Of Damaged De/Nde Bearing, Geared Coupling, Realignments For Ring Granulator As And When Required At Mm Ii Subdivision Of Mm/Chp/Btps From 01.04.2026 Or From Actual Date Of Commencement Of Work Up To 31.03.2027.
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 694954 |
|
Reference Number |
e-13/2026-27 of CE/Const/BTPS(SE/CHP/BTPS) |
| Tender Fee | 479 |
| EMD | 20260 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | May 02, 2026 02:30 |
| End Date |
Expired
19/05/2026
Expired 150 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Reconstruction of damaged bearing pedestals of wagon tippler 1 at chp btps
Reconstruction of damaged bearing pedestals of wagon tippler - 1 at chp,ballari themal power station (btps)
Read moreTggenco-ktps-vii stage-chp/mm-procurement of m/s elecon make:esc-584 scoop coupling spares and gear oil pumps-quotation called for-regarding
Tggenco-ktps-vii stage-chp/mm-procurement of m/s elecon make:esc-584 scoop coupling spares and gear oil pumps-quotation called for-regarding
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreReplacement of damaged polycarbonate and g.i. sheets over c.h.p. conveyor and parapet walls of different buildings at dvc, btps, bokaro.
Replacement of damaged polycarbonate and g.i. sheets over c.h.p. conveyor and parapet walls of different buildings at dvc, btps, bokaro.
Read moreWork contract for replacement / repairing of damaged chutes with flanges with the help of 20 mm / 16mm m.s. plate at chp 210 mw atps mppgcl chachai.
Work contract for replacement / repairing of damaged chutes with flanges with the help of 20 mm / 16mm m.s. plate at chp 210 mw atps mppgcl chachai.
Read moreRepair and replacement of the damaged cable tray along with cover to ensure protection of the cables from damages, equipped for conveyor belt no. 1019 and 1018 under chp-cpp, ppr.
Repair and replacement of the damaged cable tray along with cover to ensure protection of the cables from damages, equipped for conveyor belt no. 1019 and 1018 under chp-cpp, ppr.
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreRequirement of fc pst 750 bare coupling without accessories for scoop coupling of ring granulator crusher installed at chp, ssctps, suratgarh.
Requirement of fc pst 750 bare coupling without accessories for scoop coupling of ring granulator crusher installed at chp, ssctps, suratgarh.
Read moreProcurement of elecon scoop coupling spares for chp nkstpp
Procurement of elecon scoop coupling spares for chp nkstpp
Read moreBtps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Read moreof your Industry type