| Particulars | Details |
|---|---|
| Title |
Extension Of Gainadi L/B Embankment From Somanigaon To Amguri Pwd Road (Ph I) From Ch.6200m To 10410/4210m.
|
| Description |
Extension Of Gainadi L/B Embankment From Somanigaon To Amguri Pwd Road (Ph I) From Ch.6200m To 10410/4210m.
|
| Organisation | Government of Assam |
| Tender Id | 2023_DoWR_33038_1 |
|
Reference Number |
DHEMAJI/2023-24/RIDF/I |
| Tender Fee | 20000 |
| EMD | 21.94 Lakh |
| Tender Value | - |
| Place | Guwahati |
| Link |
View Original Tender Notice
https://assamtenders.gov.in |
| Start Date | October 30, 2023 15:30 |
| End Date |
Expired
06/11/2023
Expired 1076 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Urgent desilting and rehabilitation of the affected paddy fields between ch.34705 m to ch.38305 m handka to cuelim, necessitated by deposition of eroded soil washed down from the breached service road embankment. - retendered 2nd call
Urgent desilting and rehabilitation of the affected paddy fields between ch.34705 m to ch.38305 m handka to cuelim, necessitated by deposition of eroded soil washed down from the breached service road embankment. - retendered 2nd call
Read moreContract package-p4-partial and full demolition/dismantling of buildings/structures identified from hosahalli station to kadabagere station (from ch. -0.600km to ch.11.907 km) excluding 1.64 km (from ch.4.620km to 6.26km) in corridor-2 of bmrcl ph-3.
Contract package-p4-partial and full demolition/dismantling of buildings/structures identified from hosahalli station to kadabagere station (from ch. -0.600km to ch.11.907 km) excluding 1.64 km (from ch.4.620km to 6.26km) in corridor-2 of bmrcl ph-3.
Read moreRectification of settlement and restoration of high embankment approach to rob from ch. 115.660 to ch 115.910 lhs of nh 20 and construction of service roads wit cc drains at raisun and padmapur build up areas in the state of odisha
Rectification of settlement and restoration of high embankment approach to rob from ch. 115.660 to ch 115.910 lhs of nh 20 and construction of service roads wit cc drains at raisun and padmapur build up areas in the state of odisha
Read moreRfp for construction of embankment, cutting, minor bridges, service buildings, p.way works and associated railway electrification and signal and telecom works between new jalpaiguri (including) to chatterhat (including) (between ch ch 0.4600 km to 22.070 km) and tin mile hat (including) to aluabari (including) (between ch ch 38.400 km to 57.730 km) in connection with 3rd and 4th railway lines between new jalpaiguri - aluabari.
Rfp for construction of embankment, cutting, minor bridges, service buildings, p.way works and associated railway electrification and signal and telecom works between new jalpaiguri (including) to chatterhat (including) (between ch ch 0.4600 km to 22.070 km) and tin mile hat (including) to aluabari (including) (between ch ch 38.400 km to 57.730 km) in connection with 3rd and 4th railway lines between new jalpaiguri - aluabari.
Read moreConstruction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)
Construction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)
Read moreDesign, manufacture, supply, testing, commissioning of passenger rs, machinery and plant, training of personnel, camc for 15 years of rs for nmrp ph-ii and pmrp ph-ii (e-w extension) and conversion of 3 car trainset of pune metro to 6 car trainsets.
Design, manufacture, supply, testing, commissioning of passenger rs, machinery and plant, training of personnel, camc for 15 years of rs for nmrp ph-ii and pmrp ph-ii (e-w extension) and conversion of 3 car trainset of pune metro to 6 car trainsets.
Read moreExtension by incorporating piped irrigation system for of dwc 9 off taking from ch 9 18 km of b 2 distributory of rbmc of tip in village allarna of pernem taluka
Extension by incorporating piped irrigation system for of dwc 9 off taking from ch 9 18 km of b 2 distributory of rbmc of tip in village allarna of pernem taluka
Read moreDevelopment of road from dk road near embankment to jibananda school via cremation l 1.50 km under pwd randb khowai subdivision during the year 2026 27 sh construction of rcc drain and rcc drain cover etc. from ch. 0.00 m to 400.00 m gr 1
Development of road from dk road near embankment to jibananda school via cremation l 1.50 km under pwd randb khowai subdivision during the year 2026 27 sh construction of rcc drain and rcc drain cover etc. from ch. 0.00 m to 400.00 m gr 1
Read moreDevelopment of road from dk road near embankment to jibananda school via cremation l 1.50 km under pwd randb khowai subdivision during the year 2026 27 sh construction of rcc drain and rcc drain cover etc. from ch. 400.00 m to 900.00 m gr 2
Development of road from dk road near embankment to jibananda school via cremation l 1.50 km under pwd randb khowai subdivision during the year 2026 27 sh construction of rcc drain and rcc drain cover etc. from ch. 400.00 m to 900.00 m gr 2
Read more765kv ais new substation package ss183 for i establishment of 765/400 kv asana chandauli s/s-ais, ii extension of 765kv lucknow-ii s/s (ais) for switchable line reactor bays, iii extension of 765kv nawada s/s ais, iv extension of 400kv gonda s/s upptcl-ais associated with transmission scheme for evacuation of power as part of rajasthan rez ph-iv part-6: 6gw bikaneer complex bikaneer v: 6gw part d through tbcb route
765kv ais new substation package ss183 for i establishment of 765/400 kv asana chandauli s/s-ais, ii extension of 765kv lucknow-ii s/s (ais) for switchable line reactor bays, iii extension of 765kv nawada s/s ais, iv extension of 400kv gonda s/s upptcl-ais associated with transmission scheme for evacuation of power as part of rajasthan rez ph-iv part-6: 6gw bikaneer complex bikaneer v: 6gw part d through tbcb route
Read moreof your Industry type