Tender Details
Particulars | Details |
---|---|
Title |
Mla Sdf Pallikkara Md Construction Of Bridge Near Ch 2/040 Km Of Pallikkara Md General Civil Work
|
Description |
The Items Of The Estimate Are Earth Work, Cc 1 4 8 Concrete For Levelling Course , Cc 1 2 4 Concrete For&Amp#X0d
Culvert Foundation And Abutment, Rcc 1 2 4 ,20mm Aggregate For Bed Block And Parapet ,Centering And&Amp#X0d
Shuttering , Rcc 1 1.5 3 For Slab, Steel
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 600 |
EMD | 6756 |
Tender Value | |
Place | Pallikkara |
Link |
AAAAAAAAAA Login to view |
Start Date | May 24, 2025 23:05 |
End Date |
13/06/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreLong-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConst. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreConstruction of 48.10 m. bridge over barana khad at km. 37.120 and 74.20 m. borewali khad at km. 38.580 and lvup at km. 37.425 on nh503 extn. in the state of hp.
Construction of 48.10 m. bridge over barana khad at km. 37.120 and 74.20 m. borewali khad at km. 38.580 and lvup at km. 37.425 on nh503 extn. in the state of hp.
Read moreof your Industry type