Tender Details
Particulars | Details |
---|---|
Title |
Cleaning, Testing And Adjusting Of Ci Test Weights (1000 Pcs. X 20 Kgs. Each) For The Purpose Of Stamping Of Ci Test Weights At 60 T Dbocp Coal Dump Weighbridge
|
Description |
Cleaning, Testing And Adjusting Of Ci Test Weights (1000 Pcs. X 20 Kgs. Each) For The Purpose Of Stamping Of Ci Test Weights At 60 T Dbocp Coal Dump Weighbridge
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_331537_1 |
Reference Number |
BCCL/CV/XII/EnM/ TENDER/2024-25/120 |
Tender Fee | 0 |
EMD | 700 |
Tender Value | |
Place | Road Weighbridge (DBOCP) |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343680 |
Start Date | March 07, 2025 18:30 |
End Date |
15/03/2025 ( Expired 37 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Spl repair of ber summer appliances at 39 gtc, varanasi cantt and provn of 09 x 1.5 ton split ac for 304 fd hosp at old cantt prayagraj.
Spl repair of ber summer appliances at 39 gtc, varanasi cantt and provn of 09 x 1.5 ton split ac for 304 fd hosp at old cantt prayagraj.
Read moreDesign, supply, installation, testing and commissioning of dust cleaning solution for sheeter machine at bnpm plant, mysuru.
Design, supply, installation, testing and commissioning of dust cleaning solution for sheeter machine at bnpm plant, mysuru.
Read moreSupply, installation, testing, commissioning and operation and maintenance of 2107 kw hybrid rooftop solar power plants with 3 kwh battery energy storage system for each kw system at various government buildings of ut of lakshadweep
Supply, installation, testing, commissioning and operation and maintenance of 2107 kw hybrid rooftop solar power plants with 3 kwh battery energy storage system for each kw system at various government buildings of ut of lakshadweep
Read moreCleaning of drain at mgr siding along with disposed of slush over engine escape line and cleaning of existing drain, cutting of kuchha drain and cleaning of garland drain aside ob dump no. 4,5,10 and 11 in monsoon for the year 2025-26lingaraj ocp la
Cleaning of drain at mgr siding along with disposed of slush over engine escape line and cleaning of existing drain, cutting of kuchha drain and cleaning of garland drain aside ob dump no. 4,5,10 and 11 in monsoon for the year 2025-26lingaraj ocp la
Read moreAssistance for proper cleaning of drainage, coal spillage, level crossing, upgradation of coal stock by mechanical means at ir siding and ntpc wharf wall siding of dipka area for a period of 365 days.
Assistance for proper cleaning of drainage, coal spillage, level crossing, upgradation of coal stock by mechanical means at ir siding and ntpc wharf wall siding of dipka area for a period of 365 days.
Read morePre-engineered turnkey execution for design, supply, erection, commissioning, trial run, testing with o and m during dlp etc. for coal handling plant with silo loading arrangement at lakhanpur area, ib valley coalfields of mcl.
Pre-engineered turnkey execution for design, supply, erection, commissioning, trial run, testing with o and m during dlp etc. for coal handling plant with silo loading arrangement at lakhanpur area, ib valley coalfields of mcl.
Read moreOperational contract of 2 nos. x 315 tr capacity central air conditioning plant in three shifts with one operator and one ac helper in each shift at bharatratna dr. babasaheb ambedkar municipal gen. hospital, kandivali (w) for the period of one year
Operational contract of 2 nos. x 315 tr capacity central air conditioning plant in three shifts with one operator and one ac helper in each shift at bharatratna dr. babasaheb ambedkar municipal gen. hospital, kandivali (w) for the period of one year
Read moreConstruction and preparation of test set up for testing of high grade concrete buster slabs at tbrl, ramgarh
Construction and preparation of test set up for testing of high grade concrete buster slabs at tbrl, ramgarh
Read moreCleaning of spillage coal and clearing of grizzley during unloading of tippers at truck receiving station of silo section and other places by mechanical means in back shifts for a period of 365 days at dipka expansion project.
Cleaning of spillage coal and clearing of grizzley during unloading of tippers at truck receiving station of silo section and other places by mechanical means in back shifts for a period of 365 days at dipka expansion project.
Read moreProviding opening at each floor closing of opening of the opening duct at head room for the work of supply installation testing and commissioning passenger lift at administrative building panjrapur
Providing opening at each floor closing of opening of the opening duct at head room for the work of supply installation testing and commissioning passenger lift at administrative building panjrapur
Read moreof your Industry type