Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚧 Bharat Coking Coal Limited (Bccl) Seeks Amc For 60 T Coal Dump Road Weighbridge 🚨 Bharat Coking Coal Limited (Bccl), A Public Sector Undertaking, Is Calling For Tenders For An Annual Maintenance Contract (Amc) For The 60 T Dbocp Coal Dump Road Weighbridge Under The Cv Area. 📅 Submission Deadline: April 25, 2024, 1:00 Pm Tender Fee: Nil Emd: Inr 1400 The Contract Will Encompass Comprehensive Maintenance Services To Ensure The Weighbridge's Optimal Performance And Reliability. Interested Vendors Should Submit Detailed Proposals, Including Maintenance Plans, Technical Specifications, And Financial Bids. Keywords: Annual Maintenance Contract, 60 T Dbocp Coal Dump Road Weighbridge, Bharat Coking Coal Limited, Public Sector Undertaking, Weighbridge Maintenance, Tender, Bid Submission| Particulars | Details |
|---|---|
| Title |
Annual Maintenance Contract For 60 T Dbocp Coal Dump Road Weighbridge Under Cv Area.
|
| Description |
Annual Maintenance Contract For 60 T Dbocp Coal Dump Road Weighbridge Under Cv Area.
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2024_BCCL_306639_1 |
|
Reference Number |
BCCL/CV/XII/EnM/ TENDER/2024-25/02 |
| Tender Fee | 0 |
| EMD | 1400 |
| Tender Value | - |
| Place | Road Weighbridge (DBOCP) |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=317753 |
| Start Date | April 16, 2024 18:30 |
| End Date |
Expired
25/04/2024
Expired 899 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreAnnual maintenance contract (amc) 60t dbocp coal dump road weighbridge at dbocp colliery, cv area
Annual maintenance contract (amc) 60t dbocp coal dump road weighbridge at dbocp colliery, cv area
Read moreRepairing of broken/cracked platform structure at 60t dbocp coal dump weighbridge under cv area.
Repairing of broken/cracked platform structure at 60t dbocp coal dump weighbridge under cv area.
Read moreAnnual maintenance contract (amc) for 60t docp borira coal dump road weighbridge at damagoria colliery, cv area
Annual maintenance contract (amc) for 60t docp borira coal dump road weighbridge at damagoria colliery, cv area
Read moreAnnual maintenance contract (amc) for 60t docp borira coal dump road weighbridge at damagoria colliery, cv area.
Annual maintenance contract (amc) for 60t docp borira coal dump road weighbridge at damagoria colliery, cv area.
Read moreAnnual maintenance contract (amc) for 60t docp borira coal dump road weighbridge at damagoria colliery, cv area
Annual maintenance contract (amc) for 60t docp borira coal dump road weighbridge at damagoria colliery, cv area
Read moreCommissioning of earthing at weighbridge of dbocp, cv area.
Commissioning of earthing at weighbridge of dbocp, cv area.
Read moreReplacement of digitizer and 01no of load cell, repairing of 02nos. of load cell and the platform structure work at the 60t dbocp coal dump weighbridge under cv area.
Replacement of digitizer and 01no of load cell, repairing of 02nos. of load cell and the platform structure work at the 60t dbocp coal dump weighbridge under cv area.
Read moreof your Industry type