Tender Details

Particulars Details
Title
La Lcm Kit
Description
Organisation NA | Ministry of Power
Tender Id GEM/2024/B/5649016
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date November 26, 2024 18:02
End Date
Expired 06/12/2024

Expired 675 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Buyer Name: Shailendra
Ministry: Ministry Of Power
Department: Na
Organisation: Ntpc Limited

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 BEACON ENERGY SOLUTIONS PRIVATE LIMITED Make : Beacon Energy Solutions Private Limited Model : LCA Title : LA LCM KIT 09-12-2024 16:19:53 MII MSE Qualified
2 Jogeshwari Engineering Industries Make : Branded Model : LA LCM KIT Title : LA LCM KIT 10-12-2024 12:24:25 MII Disqualified
3 SCOPE T&M PRIVATE LIMITED Make : SCOPE T&M Model : SA 30i+ Title : LA LCM KIT 09-12-2024 14:39:14 MII Qualified
4 TEKMEASURE Make : NA Model : NA Title : LA LCM KIT 09-12-2024 13:28:53 MII Disqualified
Similar Tenders
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise