Tender Details
Particulars | Details |
---|---|
Title |
Ee/Pmgsy/Bul/2023 24/Dpc 03
|
Description |
Upgradation Of 1.Mdr 13 To Bhalegaon Poraj Road Tq. Khamgaon 2.Nh 753 E Dhapati Mandaka Hiwara Kh Tandulwadi Road Tq. Khamgaon 3.Jawala To Gaigaon Bk. Kd. Road Tq. Shegaon
|
Organisation | Government of Maharashtra |
Tender Id | 2023_MMGSY_917106_1 |
Reference Number |
EE/PMGSY/MRRDA/BUL/2023-24 |
Tender Fee | 29500 |
EMD | 5.22 Lakh |
Tender Value | |
Place | Office of SE PMGSY MRRDA Amravati Region Amravati |
Link | https://mahatenders.gov.in |
Start Date | June 19, 2023 16:30 |
End Date |
05/07/2023 ( Expired 686 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreImprovement and maintainance of nh-61 to purna aabadi kanadkheda vr-36 road.0/00 to 3/250 tq. purna and dist. parbhani.
Improvement and maintainance of nh-61 to purna aabadi kanadkheda vr-36 road.0/00 to 3/250 tq. purna and dist. parbhani.
Read moreConstruction of bituminous layer over pcc road from nh to phase 3 e1 and phase 1 id to a115 via housing colony, balidih industrial area jiada.
Construction of bituminous layer over pcc road from nh to phase 3 e1 and phase 1 id to a115 via housing colony, balidih industrial area jiada.
Read moreImprovement of road from palku to sirduk (hrangkhawl para) via 1 no songtang, 2 no songtang and 3 no songtang under ridf xxx of nabard. (job no. tp/com/223/2024-25)
Improvement of road from palku to sirduk (hrangkhawl para) via 1 no songtang, 2 no songtang and 3 no songtang under ridf xxx of nabard. (job no. tp/com/223/2024-25)
Read moreConst. of rcw on n h no-314 to zunzarpur ambora road at ch-1/600 and improvement to ch 1/500 to 2/700 v r no114 total length 3.00km tq pandharkawada distt yavatmal
Const. of rcw on n h no-314 to zunzarpur ambora road at ch-1/600 and improvement to ch 1/500 to 2/700 v r no114 total length 3.00km tq pandharkawada distt yavatmal
Read moreImprovement to tangi bhatimunda road from 1/987 km to 2/425 km, 2/700 km to 2/800 km, 3/100 km to 3/625 km and 4/285 km to 5/345 km in the district of cuttack.
Improvement to tangi bhatimunda road from 1/987 km to 2/425 km, 2/700 km to 2/800 km, 3/100 km to 3/625 km and 4/285 km to 5/345 km in the district of cuttack.
Read moreFormation of earthen to bt road at chinnapan street west cross-2, saravana garden main road, saravana garden east cross-1, saravana garden east cross-2, saravana garden east cross-3,div no 22 , 25 zone-1
Formation of earthen to bt road at chinnapan street west cross-2, saravana garden main road, saravana garden east cross-1, saravana garden east cross-2, saravana garden east cross-3,div no 22 , 25 zone-1
Read moreMtc. of road from (1) dhanchakma road to tarachand rupini para (l-1.70 km), (2) gm road to golabari-ghilatali road via pakpaibari road (l-2.40 km), (3) gm road to golabari-ghilatali road via sanatan das para road (l-2.00 km) during the year 2025-26/
Mtc. of road from (1) dhanchakma road to tarachand rupini para (l-1.70 km), (2) gm road to golabari-ghilatali road via pakpaibari road (l-2.40 km), (3) gm road to golabari-ghilatali road via sanatan das para road (l-2.00 km) during the year 2025-26/
Read moreof your Industry type