Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Replacement Of Damaged Ac Sheet In Boiling House (Centrifugal House) At Chini Mill
|
| Description |
Replacement Of Damaged Ac Sheet In Boiling House (Centrifugal House) At Chini Mill
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_TGKSC_828844_1 |
|
Reference Number |
civil/2023-24/727 DT 12/08/2023 |
| Tender Fee | 590 |
| EMD | 8000 |
| Tender Value | - |
| Place | The Ganga Kisan Sahkari Chini Mills Ltd., Morna, M |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | August 14, 2023 14:30 |
| End Date |
Expired
21/08/2023
Expired 1147 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of damaged sheeting of godowns 1, 11 and iii nos and providing gi sheet roofing and painting to existing structures at market yard nereducherla under amc., nereducherla of suryapet district.
Replacement of damaged sheeting of godowns 1, 11 and iii nos and providing gi sheet roofing and painting to existing structures at market yard nereducherla under amc., nereducherla of suryapet district.
Read moreReplacement of damaged 200mm swg line with 300mm at krishna reddy nagar colony lane 2 under cherlapally section, s.d-1, o and m dn.xiv. hmwssb.
Replacement of damaged 200mm swg line with 300mm at krishna reddy nagar colony lane 2 under cherlapally section, s.d-1, o and m dn.xiv. hmwssb.
Read moreReplacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.
Replacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.
Read moreTggenco btps stage-ii bm-division replacement, repair and rectification of mill discharge valve assembly, inspection / repair of orifices and replacement of coupling gaskets of coal pipes of xrp-943 bowl mills of unit -iv during overhaul for the year 2026-27
Tggenco btps stage-ii bm-division replacement, repair and rectification of mill discharge valve assembly, inspection / repair of orifices and replacement of coupling gaskets of coal pipes of xrp-943 bowl mills of unit -iv during overhaul for the year 2026-27
Read moreReplacement of damaged sludge disposal pipeline from road crossing near additional clarifier along rtps compound wall up to existing pipe rack including supply of required material
Replacement of damaged sludge disposal pipeline from road crossing near additional clarifier along rtps compound wall up to existing pipe rack including supply of required material & as per tender document
Read moreReplacement of damaged 200mm with 200mm swg line from near ration shop, shishumandir school, kushaiguda under cherlapally section, sd.1, under o and m dn.xiv, uppal hmwssb..
Replacement of damaged 200mm with 200mm swg line from near ration shop, shishumandir school, kushaiguda under cherlapally section, sd.1, under o and m dn.xiv, uppal hmwssb..
Read moreConstruction of an rcc drain and replacement of damaged slabs from shambhu sharma's shop (ward no. 21), passing via shubh mangalam marriage hall, up to sohan patel's house.
Construction of an rcc drain and replacement of damaged slabs from shambhu sharma's shop (ward no. 21), passing via shubh mangalam marriage hall, up to sohan patel's house.
Read moreReplacement of old aged damaged 200mm dia sewerage line from 2-2-74 to 2-2-42/1 in hanumasai nagar colony under uppal ward, uppal circle under division-4, uppal zone-ii
Replacement of old aged damaged 200mm dia sewerage line from 2-2-74 to 2-2-42/1 in hanumasai nagar colony under uppal ward, uppal circle under division-4, uppal zone-ii
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreReplacement of damaged ac sheet in boiling house (centrifugal house) at chini mill
Replacement of damaged ac sheet in boiling house (centrifugal house) at chini mill
Read moreof your Industry type