Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Pm Shri Single Lab At Kv Happy Valley Under Ge Shillong
|
| Description |
Construction Of Pm Shri Single Lab At Kv Happy Valley Under Ge Shillong
|
| Organisation | E-IN-C BRANCH - MILITARY ENGINEER SERVICES | Central Govt. Ministry/Department |
| Tender Id | 2024_MES_688672_1 |
|
Reference Number |
8837/SHL/E8 |
| Tender Fee | 500 |
| EMD | 80500 |
| Tender Value | |
| Place | Shillong |
| Link |
View Original Tender Notice
https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=770872 |
| Start Date | December 28, 2024 17:30 |
| End Date |
Expired
04/01/2025
Expired 567 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Provision of arboriculture and associated work at certain location at af station arjan singh under ge p af panagarh
Provision of arboriculture and associated work at certain location at af station arjan singh under ge p af panagarh
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreComprehensive maint of otm accn at happy valley under ge shillong
Comprehensive maint of otm accn at happy valley under ge shillong
Read moreSmart periodical services to the various bldgs at happy valley shillong under ge shillong
Smart periodical services to the various bldgs at happy valley shillong under ge shillong
Read moreRepair/maint of 33 kv machineries, transformers and allied works at shillong, happy valley and se falls area under ge shillong
Repair/maint of 33 kv machineries, transformers and allied works at shillong, happy valley and se falls area under ge shillong
Read moreSpecial repair to bldg no p- 332 at happy valley shillong under ge shillongahati
Special repair to bldg no p- 332 at happy valley shillong
 under ge shillong
Read moreAddition/alteration to certain otm accn at happy valley under ge shillong
Addition/alteration to certain otm accn at happy valley under ge shillong
Read moreof your Industry type