| Title |
Supply And Installation Of Winding Temperature Meter, Oil Temperature Meter And Buchholz Relay Alam Bell System In 02 Nos Of 1 Mva,11 Kv/3.3 Kv,Power Transformers,Installed At Dumerbera Sub Station Of Ara Colliery Under Kuju Area.
|
| Description |
Supply And Installation Of Winding Temperature Meter, Oil Temperature Meter And Buchholz Relay Alam Bell System In 02 Nos Of 1 Mva,11 Kv/3.3 Kv,Power Transformers,Installed At Dumerbera Sub Station Of Ara Colliery Under Kuju Area.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_283980_1 |
|
Reference Number |
GM (K)/EnM/e-Tender/23-24/50 |
| Tender Fee | - |
| EMD | 2700 |
| Tender Value | - |
| Place | GM UNIT KUJU |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | July 21, 2023 00:25 |
| End Date |
Expired
31/07/2023
Expired 1169 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing and maintenance of 11kv and 3.3kv bus bar of 2 mva , dumerbera sub-station along with repairing of damaged wall and fixing of existing main gate of 2mva dumerbera sub-station of ara project under kuju area
Repairing and maintenance of 11kv and 3.3kv bus bar of 2 mva , dumerbera sub-station along with repairing of damaged wall and fixing of existing main gate of 2mva dumerbera sub-station of ara project under kuju area
Read moreRepairing and complete rewinding of the national electrical indus ltd. make ,1mva,11kv/3.3kv, s.no. ry/775 , power transformer installed at dumerbera substation of ara colliery under kuju area.
Repairing and complete rewinding of the national electrical indus ltd. make ,1mva,11kv/3.3kv, s.no. ry/775 , power transformer installed at dumerbera substation of ara colliery under kuju area.
Read moreWork for con of existing 3.3kv bus-bar of ara-kanta substation into 11kv bus-bar, dismantling of complete 3.3kv oh line from ara -kanta substation to dumerbera substation and installation of transformers at ara kanta substaion.
Work for con of existing 3.3kv bus-bar of ara-kanta substation into 11kv bus-bar, dismantling of complete 3.3kv oh line from ara -kanta substation to dumerbera substation and installation of transformers at ara kanta substaion
Read moreMaintenance of 3.3kv oh line from dumerbera sub-station to 16b quarry and installation of 400a rated goab and do fuse at 16b quarry for safe operation 250kva 3.3kv/440v transformer installated at 16b quarry of ara colliery under kuju
Maintenance of 3.3kv oh line from dumerbera sub-station to 16b quarry and installation of 400a rated goab and do fuse at 16b quarry for safe operation 250kva 3.3kv/440v transformer installated at 16b quarry of ara colliery under kuju
Read moreRepairing and complete rewinding of 630kva ,3.3kv/440v, s.no.ara/tr/01, lighting transformer installed at ara kanta substation of ara colliery under kuju area.
Repairing and complete rewinding of 630kva ,3.3kv/440v, s.no.ara/tr/01, lighting transformer installed at ara kanta substation of ara colliery under kuju area.
Read moreVoltmeter analog,ampere meter,digital earth tester,winding temperature detector,oil temperature mea
Read more
Repairing/reconditioning of 3.3kv, 400a, reyroll burn make ocb. sl.no. 82/104, installed at dumerbera sub-station for controlling 3.3kv power supply 10 16b quarry of ara colllery. repairing/reconditioning of 11 kv, 400 amp, ocb of ara colliery.
Repairing/reconditioning of 3.3kv, 400a, reyroll burn make ocb. sl.no. 82/104, installed at dumerbera sub-station for controlling 3.3kv power supply 10 16b quarry of ara colllery. repairing/reconditioning of 11 kv, 400 amp, ocb of ara colliery.
Read moreSupply and installation of 4 nos of timer switch sets to be installed at different location of ara colliery to control the lights installed at po office, dumerbera sub-station, ara kanta substation and 16b quarry of ara colliery under kuju area.
Supply and installation of 4 nos of timer switch sets to be installed at different location of ara colliery to control the lights installed at po office, dumerbera sub-station, ara kanta substation and 16b quarry of ara colliery under kuju area.
Read moreInstallation of oil and winding temperature meter with buchholz relay assembley in crompton parkinson make, 1000kva, 11kv/550v transformer of 2 seam s/s of east basuria colliery
Installation of oil and winding temperature meter with buchholz relay assembley in crompton parkinson make, 1000kva, 11kv/550v transformer of 2 seam s/s of east basuria colliery
Read moreProviding and fixing a safety device like buchholz relay, oil, and winding temperature meter and connecting with tripping device to both 3mva, 11kv/3.3kv power transformer i.) make- g.e.c., amp. 157.6/525.5, 3 phase, 50hz., sl. no. ct4368/b-24065 and
Providing and fixing a safety device like buchholz relay, oil, and winding temperature meter and connecting with tripping device to both 3mva, 11kv/3.3kv power transformer i.) make- g.e.c., amp. 157.6/525.5, 3 phase, 50hz., sl. no. ct4368/b-24065 and