Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Laying And Joining Of 8 Inch Dia 01 Delivery Range After Dismantling From F Patch To B Patch And Installation Of 2000 Gpm 1 No. Pump Motor For The Purpose Of Maintaing Proper Water Supply For Domestic Use And Dust Suppression Purpose At B P
|
Description |
Laying And Joining Of 8 Inch Dia 01 Delivery Range After Dismantling From F Patch To B Patch And Installation Of 2000 Gpm 1 No. Pump Motor For The Purpose Of Maintaing Proper Water Supply For Domestic Use And Dust Suppression Purpose At B P
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2024_BCCL_299000_1 |
Reference Number |
BCCL/LA/EnM/F-19/23-24/262 |
Tender Fee | 0 |
EMD | 5648 |
Tender Value | |
Place | Lodna Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=309709 |
Start Date | January 19, 2024 15:30 |
End Date |
29/01/2024 ( Expired 508 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Drilling of 3 nos of 8 inch dia bore well for installation of solar pump for irrigation purpose at shang,matho,and nari institute saboo under drilling of borewell and installation of solar submersible pump at merstselang (under capex).
Drilling of 3 nos of 8 inch dia bore well for installation of solar pump for irrigation purpose at shang,matho,and nari institute saboo under drilling of borewell and installation of solar submersible pump at merstselang (under capex).
Read moreLaying, erection of 8 inch pipe range 450mtrs with pump-motor, base plate installation, tanker filling point fabrication and switch-er laying at block-iv ocp departmental patch under govindpur area
Laying, erection of 8 inch pipe range 450mtrs with pump-motor, base plate installation, tanker filling point fabrication and switch-er laying at block-iv ocp departmental patch under govindpur area
Read more(a) dismantling of drum and equalization pinion with guard and refitting of drum after changing of f/b no.4 (b) repairing and reassembling of broken chain conveyor of f/b no-4 and (c) replacement of defective motor of f/b no-5 of amp colliery.
(a) dismantling of drum and equalization pinion with guard and refitting of drum after changing of f/b no.4 (b) repairing and reassembling of broken chain conveyor of f/b no-4 and (c) replacement of defective motor of f/b no-5 of amp colliery.
Read moreDismantling, extension cum laying of the 8 inch dia m.s. pipes of the 2000 g.p.m. pump motor set, supplying water to the village pond in mine, w.r.t. karo ocp, under bnk area
Dismantling, extension cum laying of the 8 inch dia m.s. pipes of the 2000 g.p.m. pump motor set, supplying water to the village pond in mine, w.r.t. karo ocp, under bnk area
Read moreDismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Read moreTransporting and laying of 240 meter of hdpe 8 inch /ms pipes 6 inch vertical delivery range of patch b and making of 6 nos. of bends for installation of additional 600 gpm 550v pump at east bassuriya colliery
Transporting and laying of 240 meter of hdpe 8 inch /ms pipes 6 inch vertical delivery range of patch b and making of 6 nos. of bends for installation of additional 600 gpm 550v pump at east bassuriya colliery
Read moreDismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Dismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Read moreDismantling and transporting of damaged drum pontoon from main patch to f/b for repair and transporting fresh pontoon from f/b to main patch and installation of 3000gpm pump on the pontoon with di its existing pipeline at phularitand, ampc.
Dismantling and transporting of damaged drum pontoon from main patch to f/b for repair and transporting fresh pontoon from f/b to main patch and installation of 3000gpm pump on the pontoon with di its existing pipeline at phularitand, ampc.
Read moreTransportation and installation of 1000 gpm pump with motor at 124l/8d to132l/02d including laying and fitting of 6 inch diameter pipe line from 132l/02d to 123l/7d and connecting with existing pipe line for borehole at 110l.laying and installation
Transportation and installation of 1000 gpm pump with motor at 124l/8d to132l/02d including laying and fitting of 6 inch diameter pipe line from 132l/02d to 123l/7d and connecting with existing pipe line for borehole at 110l.laying and installation
Read more(a)shifting of 4000 gpm pump motor of sadbhavna sump (b)erection of 10inch dia ms pipeline (2nd range) from the sump to the top bench of 4th patch and other miscellaneous job related with pumping and pipeline works of socp and mocp patch, ampc.
(a)shifting of 4000 gpm pump motor of sadbhavna sump (b)erection of 10inch dia ms pipeline (2nd range) from the sump to the top bench of 4th patch and other miscellaneous job related with pumping and pipeline works of socp and mocp patch, ampc.
Read moreof your Industry type