Tender Details

Particulars Details
Title
Laying, Jointing, And Fittings / Dismantling Of 4 Inch And 6 Inch Dia Gi/Ms Pipe To Different Coal Stocks For Firefighting / Dust Suppression Purpose At Rks Patch And Dharam Patch Of Chhal Ocm For A Period Of 01 Year 365 Days.
Description
Laying, Jointing, And Fittings / Dismantling Of 4 Inch And 6 Inch Dia Gi/Ms Pipe To Different Coal Stocks For Firefighting / Dust Suppression Purpose At Rks Patch And Dharam Patch Of Chhal Ocm For A Period Of 01 Year 365 Days.
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_SECL_325085_1
Reference
Number
SECL/GM/RGH/EnM/e-Tender/24- 25/24 dtd. 08/01/2025
Tender Fee 0
EMD 26100
Tender Value
Place Raigarh Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=336981
Start Date January 09, 2025 15:30
End Date

19/01/2025 ( Expired 114 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Dismantling, shifting and laying of pipeline of 6 inch dia ( 800m approx.) as per requirement with priming arrangement and replacement of different types of damaged valves in existing pipelines at amrapali ocp under a-c area

Dismantling, shifting and laying of pipeline of 6 inch dia ( 800m approx.) as per requirement with priming arrangement and replacement of different types of damaged valves in existing pipelines at amrapali ocp under a-c area

Read more
Rewinding,repairing, dismantling and installation of ceiling fans and exhaust fans as and when required basis at different locations of bhubaneswari ocp for a period of 365 days

Rewinding,repairing, dismantling and installation of ceiling fans and exhaust fans as and when required basis at different locations of bhubaneswari ocp for a period of 365 days

Read more
Dismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area

Dismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area

Read more
Making of 03 nos of 8 inch dia ms pipeline range (welding of flanges, shifting, laying and jointing of pipes) from rvi to outside nallah discharge for smooth dewatering under s.b. project.

Making of 03 nos of 8 inch dia ms pipeline range (welding of flanges, shifting, laying and jointing of pipes) from rvi to outside nallah discharge for smooth dewatering under s.b. project.

Read more
Shifting, laying and fitting of different dia. pipeline with flange welding and dismantling of old ms pipeline as well as dismantling and shifting of pumps at different sumps, delivery/ suction pipe extension or shortening with float etc

Shifting, laying and fitting of different dia. pipeline with flange welding and dismantling of old ms pipeline as well as dismantling and shifting of pumps at different sumps, delivery/ suction pipe extension or shortening with float etc

Read more
Installation, alignment and commissioning of pumps with sel engine and electric motor, laying of ms pipeline with flange welding, dismantling of ms pipes and other miscellaneous work for the purpose of dewatering, firefighting as per requirement.

Installation, alignment and commissioning of pumps with sel engine and electric motor, laying of ms pipeline with flange welding, dismantling of ms pipes and other miscellaneous work for the purpose of dewatering, firefighting as per requirement.

Read more
Making of 6 inch dia ms pipeline (welding of flanges, shifting, laying and jointing of pipes) from part 2b to trs of chp 12 mty for supply of water to facilitate dust suppression under s.b. project.

Making of 6 inch dia ms pipeline (welding of flanges, shifting, laying and jointing of pipes) from part 2b to trs of chp 12 mty for supply of water to facilitate dust suppression under s.b. project.

Read more
Day to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .

Day to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .

Read more
Laying /dismantling /rearrangement of 8, 6 and 4 inch ms/gi pipe lines and dismantling, shifting and installation of pump for a period of 01 years at baroud ocm, of secl, raigarh area.

Laying /dismantling/ rearrangement of 8, 6 and 4 inch ms/gi pipe lines and dismantling, shifting and installation of pump for a period of 01 years at baroud ocm, of secl, raigarh area.

Read more
Maintenance /repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project

Maintenance/ repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project under hazaribagh area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise