Tender Details
Particulars | Details |
---|---|
Title |
Spreading Of Dust/Frost Cutting From Airport Road To Archoo Km 1st To Km19 And Link Road Gavalo Rd 0 2000mtrs And Gongkha 0 200 Mtrs And Mutirik Choskore Km 1st To Km10th And Grong Rd 0 300 Mtr, Chapring 0 1000 Mtrs
|
Description |
Spreading Of Dust/Frost Cutting From Airport Road To Archoo Km 1st To Km19 And Link Road Gavalo Rd 0 2000mtrs And Gongkha 0 200 Mtrs And Mutirik Choskore Km 1st To Km10th And Grong Rd 0 300 Mtr, Chapring 0 1000 Mtrs
|
Organisation | Public Works Department | State Govt. and UT |
Tender Id | 2024_PWD_15245_1 |
Reference Number |
PWD/DIVISION XVI (BC)/TS/42/2023-2024 Line 08 |
Tender Fee | 100 |
EMD | 10120 |
Tender Value | |
Place | CHESKORE |
Link | https://tenders.ladakh.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=37713 |
Start Date | December 16, 2024 14:30 |
End Date |
23/12/2024 ( Expired 119 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreConsultancy services for authoritys engineer for supervision of widening/improvement of existing road to nhdl specifications of road changwinti walong namti from km 0.000 to km 54.450 and hayuliang-changwinti between km 45.050 to km 50.820
Consultancy services for authoritys engineer for supervision of widening/improvement of existing road to nhdl specifications of road changwinti walong namti from km 0.000 to km 54.450 and hayuliang-changwinti between km 45.050 to km 50.820
Read moreRenewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire
Renewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire
Read moreDesign and execution of necessary protective measures in malshej ghat section of kalyan nirmal road nh-61 form km. 83-100 to 93-200 in the district of thane in the state of maharashtra.
Design and execution of necessary protective measures in malshej ghat section of kalyan nirmal road nh-61 form km. 83-100 to 93-200 in the district of thane in the state of maharashtra.
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreSs of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Ss of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Read moreProviding short term road safety measures at morth identified blackspots locations based on accident data of 2019-21 of hyderabad-vijayawada section of nh-65 (old nh-9) from km.40.000 to 221.500 in the states of telangana and andhra pradesh.
Providing short term road safety measures at morth identified blackspots locations based on accident data of 2019-21 of hyderabad-vijayawada section of nh-65 (old nh-9) from km.40.000 to 221.500 in the states of telangana and andhra pradesh.
Read moreShort term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read moreof your Industry type